Laserfiche WebLink
COST PROPOSAL <br /> Contractor: Lonerock,Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 32.0 <br /> Project No.: 14-6802;18-6424;20-6618 Revision: 1 <br /> Owner: City of Santa Ana Date: 02101- W4123 <br /> Description of Work: Additional cost due to transition structures due to SS design change <br /> based on RFI 24 23 working days extension <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular I OT Regular OT BENEFIT' AMOUNTS <br /> John Williams(Operator) 157.5 $119.42 $162.78 $18,8 88.65 <br /> Guillermo Saldana(Operator) 77.5 0.5 $f19.42 $-16277T $0,336.44 <br /> Ramon Guillen Foreman Mason 161.5 4 $99.94 $136.07 $16 680,59 <br /> Salvador Saldana(Labor IV) 54.5 $92.57 $125.81 $5,045.07 <br /> Ricardo Guillen Cement Mason 163 1.5 $93.83 $125.90 $15,483.14 <br /> Ramon Guillen Jr. Mason 169.5 2 $93.83 $16,155.99 <br /> Cruz Benavente Chan Labor 11 117 $89.36 $119!$125.90 74 $10,455.12 <br /> Jesus Gomez Labor I 58.51 $92.57 $125.81 $5,415.35 <br /> Jorge Alejandres(Lahore 11) 168.5 2 $89.36 $119.74 $15,296.64 <br /> Explain Additional Benefit: SUBTOTAL $112,676.98 <br /> MU i0% $22,535.40 <br /> �- TOTAL LABOR $135,212.37 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS, COST COST COSTS" AMOUNTS <br /> T 336EL Excavator 19 $211. 4 4,013.56 <br /> CAT 345CL Excavator 122.5 $288.41 $35,330.23 <br /> CAT 415F Skip Loader 19 $54.40 1,033.60 <br /> CAT 45OF Backhoe Loader 3 $100.93 $302.79 <br /> CAT 450E Backhoe Loader $94.17 $0.00 <br /> CAT 950H Loader 9 $155.08 $1 395.72 <br /> CAT 972H Loader 33 $276.57 $9,126.81 <br /> CAT 262D Skid Steer Loadr 14 $49.38 1 $691.32 <br /> CAT CB24B Roller $46.16 $0.00 <br /> Generator 77 $15.00 $1 155.00 <br /> Dump Truck 2 axle 10 $66.11 $661,10 <br /> Crew Truck 20000 LB 144 $49.31 $7,100.64 <br /> Water Truck 36000 LB 6 $57.21 $343.26 <br /> CAT 315F 3.5 $69.45 $243.08 <br /> H100 Hammer 3 $19.84 $59.52 <br /> •Explain Other Costs: SUBTOTAL $61,456,62 <br /> MU 15% $9,218,49 <br /> TOTAL EQUIPMENT $70,675.11 <br /> MATERIAL I UNIT EXTENDED <br /> Description(Attach invoice) UNITS OTY- PRICE AMOUNTS <br /> 3/4"Cr.Rock CY 112.84 $43,79 $4,941.26 <br /> Hardware&Lumber Home Depot etc. LS 1 $4,036.58 $4,036.50 <br /> Core and Main Material LS 1 $2,235.81 $2,235.81 <br /> CMB CY 48.8 $23.43 $1,143.38 <br /> National Ready Mix LS 1 $10,300.27 $10,300.27 <br /> Sand Bags EA 350 $2.50 $875.00 <br /> Asphalt Ton 0 $103A4 $0.00 <br /> Sand CY 7.77 $31.55 $245.14 <br /> Traffic Control Equipment Daily45 $126.62 $5,697.90 <br /> Shoring Weekly 13 1,722.01 $22,386.13 <br /> citipump 1 1.595.00 $1,595.00 <br /> Disposal Dump Fees EA 40.7 265.00 $10,785.50 <br /> Trash Disposal Costs LS 1 1,121.30 $1.121,30 <br /> SUBTOTAL $65,363.28 <br /> MU 15% $9,804.49 <br /> TOTAL MATERIAL $75,167.77 <br /> Other/Misc.Work UNIT OTHER EXTENDED <br /> UNITS OTY. PRICE COSTS' AMOUNTS <br /> Rebar Cost wl marku LS 1 $21,439.65 $21,439 65 <br /> tam a uction 56 <br /> 'Explain Other Costs: SUBTOTAL $3,760.35 <br /> MU 0% $0.00 <br /> TOTAL OTHER WORK ($3.760.35) <br /> If Abo e Record is Complete and Corect TOTAL LABOR $135,212.37 <br /> TOTAL EQUIPMENT $70,675.11 <br /> een sanative TOTAL MATERIAL $75,167.77 <br /> TOTAL OTHER WORK ($3,760.35) <br /> SQAli�i4G tiZ,772 9� <br /> City Ql epresen-- 1r�TAQFC7 PROPOSAL 5280.067.86 5/21/2024 <br />