My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br /> Report Na.: ..02' � `' <br /> Contractor: Lonervck,Inc. PCO#: 2 <br /> Project: Warner Avenue Improvements Project Project No.:14-6802;18-6424;20-6618 Date:Revision: 221/2123 <br /> =0202 3 <br /> Owner: City of Santa Ana <br /> Description of Work: Preparing and removing shoring boxes for transitional structure per RF12 <br /> LABOR HOURS HOURLY RATE ADDITIONAL. EXTENDED <br /> Name&Classification Regular- T Regular OT BENEFIT* AMOUNTS <br /> John Williams(Operator) 119.42 $1 62.78 $238.84 <br /> 119 42 $162.78 $0.00 <br /> Guillermo Saldana(Operator) 0 <br /> Ramon Guillen(Foreman Mason) 2 ' $99.94 $135.07 $1 9.88 <br /> 81$125. .00 <br /> Salvador Sald ana(Labor IV) $92.57 0.00 <br /> Ricardo Guillen(Cement Mason) $93.83 $12590 <br /> p $93.83 $125.90 $0.00 <br /> Ramon Quillen Jr.(Mason) $0 00 <br /> Cruz Benavente Chan(App) 0 $71.25 $98.67 <br /> $71.25 $98.67 $0.00 <br /> Peter Arroyo(App)Jesus Gomez(Labor-IV) 0 $92.57 $125.81 $0.00 <br /> Jorge Alejandres(I_abvr App IV) 2 $71.25 $98.67 $1$0..00 <br /> 0 <br /> `Explain Additional Benefit SUBTOTAL $581.22 <br /> MU 20% $116.24 <br /> - - - - - - - TOTAL.LABOR $697.46 <br /> EQUIPMENT 56Y Opp. SBY OPP. OTHER EXTENDED <br /> Description HRS, HRS. COST COST COSTS' AMOUNTS <br /> 4 <br /> AT 33BEL Excavator 2 187.52 <br /> 0.00 <br /> 41 <br /> CAT 415CL $256.50 Excavator $47 87 $0.00 <br /> CAT 5E Skip Loader $0.0 <br /> CAT 450F Backhoe Loader 4M$206.74 <br /> CAT 450E Backhoe Loader $0.00 <br /> CAT 950H Loader $0 <br /> CAT 972H Loader CAT 262D Skid Steer Loader <br /> CAT CB24B Roller $38.72 <br /> $36.28 0.00 <br /> Air Compressor 185 w/breaker 15.00 <br /> Dump Truck 2 axle 0 $50.64 <br /> Crew Truck 20000 LB 0 S37.19 $0.00 <br /> a er ruc 0 $45 - fl0 <br /> CAT 315E 0 $61.38 <br /> H100 Hammer 0 $19.84 $0.00 <br /> * $375.04 <br /> Explain Other Costs: SUBTOTAL _ <br /> MU 15% $56.26 <br /> -- TOTAL EQUIPMENT $431.30 <br /> UNIT EXTENDED <br /> MATERIAL <br /> Description(Attach Invoice) UNITS QTY. PRICE AMOUNTS <br /> $0.00 <br /> Pendin $0.00 <br /> SUBTOTAL $0.00_ <br /> MU 15% $0•00 <br /> TOTAL MATERIAL $0.00 <br /> OTHER WORK UNIT OTHER I EXTENDED <br /> UNITS QTY. PRICE COSTS' AMOUNTS <br /> 0.0 <br /> *Explain Other Casts: SUBTOTAL $0.00 <br /> MU 15% $0.00 <br /> -- - - - -- TOTAL OTHER WORK $0.00 <br /> If Above Record is Complete and Correct TOTAL LABOR 97.46 <br /> TOAL EQUIPMENT $431.30 <br /> Contractor's Representative TOTAL MATERIAL $0.00 <br /> ,a 69r"i�jltfb $�'+ ao <br /> pwnets Represerrtetive / r.fJJ 11 - 394'OTAL THIS PROPOSAL <br /> --77 :-7 f . <br />
The URL can be used to link to this page
Your browser does not support the video tag.