Laserfiche WebLink
COST PROPOSAL <br /> Contractor: Lonerock,Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 320 <br /> Project No.:14-6802;18-6424-,20-6618 Revision: 2 <br /> Owner: City of Santa Ana Date: 02101->3124123 <br /> Description of Work: Additional cost due to transition structures due to SS design change <br /> based on RFI 24 23 working days extension <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification R utar OT Regular OT BENEFIT` AMOUNTS <br /> John Williams(Operator) B77 <br /> 119.42 $162.78 $18,808.65 <br /> Guillermo Saldana(Operator) 0-5 $119.42 $182.78 $9,336.44 <br /> Ramon Guillen Foreman Mason 4 $99.94 $135.07 $16,680.59 <br /> Salvador Saldana Labor i $9257 $125.81 $5,045.07Ricardo Guillen Cement Mason 1b $93.83 $125.90 $15,483.14 <br /> Ramon Guillen Jr_ Mason 2 $93.83 $125.90 $16,155.99 <br /> Cruz Benavente Chan Laborer ±$71.25 <br /> .36 $119-74 $2,591.44 <br /> Cruz Benavente Chan(Apprentice) Be $98.67 $6,270.00 <br /> Jesus Gomez Labor E 58.5 .57 $125.81 $5,415,36 <br /> Jorge Alejandres(Laborer) 168.5 2 $89,36 $119.74 $15,296.64 <br /> 'Explain Additional Benefit: SUBTOTAL $111,083.30 <br /> MU 20% $22,216.66 <br /> TOTAL LABOR $133,299.95 <br /> EQUIPMENT SBY OPP. SBY OPP OTHER EXTENDED <br /> Description HRS. HRS_ COST COST COSTS' AMOUNTS <br /> CAT 336EL Excavator 19 $211 24 $4713.56 <br /> CAT 345CL Excavator 122.5 $288 41 $35,330.23 <br /> CAT 415F Skip Loader 19 $54,40 $1033,60 <br /> CAT 45OF Backhoe Loader 3 $100.93 $302.79 <br /> CAT 450E Backhoe Loader 1 $94.17 $0.00 <br /> CAT 950H Loader 9 $155.08 $1.395,72 <br /> CAT 972H Loader 33 $276.57 $9,126.81 <br /> CAT 262D Skid Steer Loadr 13 $49.38 $641 94 <br /> CAT CB24B Roller $46.16 $0.00 <br /> Generator 71 $1500 $1,065.00 <br /> Dump Truck 2 axle 10 $66,11 $661.10 <br /> Grew Truck 20000 LB 136 $49,31 $6,706.16 <br /> Water Truck 36000 LB 4 $57.21 $228.84 <br /> CAT 315F 3 5 $69.45 $243.08 <br /> H100 Hammer 3 $19.64 $59.52 <br /> 'Explain Other Costs: SUBTOTAL $60,808.34 <br /> MU 15% $9,121.25 <br /> TOTAL EQUIPMENT $69,929.59 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS CITY. PRICE AMOUNTS <br /> 3I4"Cr.Rock CY 11284 $43.79 $4,941.26 <br /> Hardware 81 Lumber Home Depot etc. 1-5 i $3_517-4a ",51T.48 <br /> Core and Main Material LS 1 $2 235.81 $2.235.81 <br /> CMB CY 4881 $23.43 $1,143.38 <br /> National Ready Mix LS 1 $10,300-27 $10 300.27 <br /> Sand Bags EA 3501 $2.50 $875.00 <br /> Asphalt Ton 01 $103.44 $0,00 <br /> Sand CY 777 $31 55 $245.14 <br /> Traffic Control Equipment Dail 45 $126,62 $5 697.90 <br /> Shoring Weekl 13 1,722,01 $22386.13 <br /> cihpum LS 1 1,595.0o $1,595.00 <br /> Disposal DumpFees EA 40.7 266.00 $10,785.50 <br /> Trash Disposal Costs ILS 1 1.121.30 $1,121.30 <br /> SUBTOTAL VA,844.18 <br /> MU 15% $9,726.63 <br /> TOTAL MATERIAL $74,570.81 <br /> OtheriMRsc,Work UNIT OTHER EXTENDED <br /> UNITS QTY_ PRICE COSTS` AMOUNTS <br /> Rebar Cost wl markU LS 1 $21,439.65 $21 439.65 <br /> Rem u ion 4 <br /> 'Explain Other Costs: SUBTOTAL $3,760,35) <br /> MU 0% $0.00 <br /> TOTAL OTHER WORK ($3,760.35) <br /> If Ab ve R rd is Complete and Correct TOTAL LABOR $133,299.95 <br /> TOTAL EQUIPMENT $69,929.59 <br /> 6e presentative TOTAL MATERIAL $74,570.81 <br /> TOTAL OTHER WORK ($3,760.35) <br /> BOND IV. $2.740,40 <br /> -.1 T iC 000Q 1C/11 IZ 17r,7An All <br /> City Council 11 - 454 5/21/2024 <br />