Laserfiche WebLink
COST PROPOSAL <br /> Contractor: Lonerock,Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 32.0 <br /> Project No.:14-6802;18-6424;20-6618 Revision: <br /> Owner. City of Santa Ana Date: 02/01-?3/24123 <br /> Description of Work: Additional cost due to transition structures due to SS design change <br /> based on RFI 24 23 working days extension <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT" AMOUNTS <br /> John Williams(Operator) 157.5 $119,42 $162.78 $18,808.65 <br /> Guillermo Saldana(Operator) 77.5 0.5 $119.42 $162.78 $9,336,44 <br /> Ramon GuiHen Foreman Mason 161.5 4 $99.94 $135.07 $16,680.59 <br /> Salvador Saldana Labor IV 54.5 $92.57 $125.81 $5.045.07 <br /> Ricardo Guillen Cement Mason 163 1.5 $93.83 $125.90 $15,483.14 <br /> Ramon GuiHen Jr. Mason 169.5 2 $93.83 $125.90 $16,155.99 <br /> Cruz Benavente Chan Labor II 117 $89.36 $119.74 $10,455.12 <br /> Jesus Gomez Labor 1V) 1 58.51 $92.57 $125.81 S5,415.35 <br /> Jorge Alejandres(Labore ll) 1 168.5 2 $89.36 $119.74 $15,296.64 <br /> Explain Additional Benefit: SUBTOTAL $112,676.98 <br /> MU 20% $22.535,40 <br /> TOTAL LABOR $135,212.37 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Descri lion HRS- HRS. COST COST COSTS` AMOUNTS <br /> AT 336 L Excavator 19 $187.52 $3,562.88 <br /> CAT 345CL Excavator 122.5 $256.50 $31,421.25 <br /> CAT 415F Skip Loader 19 $47.87 1 $909.53 <br /> CAT 45OF Backhoe Loader 3 $83.95 $251.85 <br /> CAT 450E Backhoe Loader $83.95 $0.00 <br /> CAT 950H Loader 9 $136.17 $1,225.53 <br /> CAT 972H Loader 33 $206.74 $6,822.42 <br /> CAT 262D Skid Steer Loadr 14 $40.25 $563.50 <br /> CAT CO24B Roller $38,72 $0.00 <br /> Generator 77 $15.00 1 $1,155,00 <br /> Dump Truck 2 axle 10 $50.64 $506.40 <br /> Crew Truck 20000 LB 144 $37.19 $5,355.36 <br /> Water Truck 36000 LB 6 $45.04 $270,24 <br /> CAT 315F 3.5 $61.38 $214.83 <br /> H100 Hammer 3 $19.84 $59.52 <br /> Explain Other Costs: SUBTOTAL $52,318.31 <br /> _ MU 15% $7,847.75 <br /> TOTAL EQUIPMENT $60,166,06 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS OTY. PRICE AMOUNTS <br /> 3/4"Cr Rock CY 112.84 S43.79 $4,941.26 <br /> Hardware&Lumber Home Depot etc. LS 1 $4.036.58 $4,036.58 <br /> Core and Main Material LS 1 S2,235.81 $2,235.81 <br /> CMB CY 48-8 $23.43 $1,143.38 <br /> National Ready Mix LS 1 $10,300.27 $10,300.27 <br /> Sand Bags EA 350 $2 50 $875.00 <br /> Asphalt Ton 0 $103.44 $0.00 <br /> Sand CY 777 $3155 $245.14 <br /> Traffic Control Equipment Dail 45 $126.62 $5,697.90 <br /> Shoring Weekly 13 1.722.01 $22,386.13 <br /> Citipump ILS 1 1 1,595.00 $1,595.00 <br /> Disposal Dump Fees JEA 1 40.7 265.00 $10.785.50 <br /> Trash Disposal Costs ILS 1 1 1,121.30 $1,121.30 <br /> SUBTOTAL _$65,363.28 <br /> MU 15% _ $9,804.49 <br /> TOTAL MATERIAL $75,167.77 <br /> OtheriMisc.Work UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS' AMOUNTS <br /> Reber Cost wl marku LS 1 $21,439.65 $21,439.65 <br /> em ucton 5 5. <br /> 'Explain Other Costs: SUBTOTAL ($3,760.35 <br /> MU 0% $0.00 <br /> TOTAL OTHER WORK ($3,760.35) <br /> If Above rd is Complete and Corfect` TOTAL LABOR $135,212.37 <br /> TOTAL EQUIPMENT $60.166.06 <br /> on re iE•l wtwe TOTAL MATERIAL $75.167.77 <br /> TOTAL OTHER WORK ($3,760.35) <br /> nntvn 1% 5;2 rr7 Re <br /> City C ClrvygrFFienreae tativg fITAL5132PROPOSAL $269453.71 5/21/2024 <br />