Laserfiche WebLink
DAILY EXTRA WORK REPORT 3© 3 <br /> Report No.: <br /> Contractor: Lonerock,Inc. PCO#: 3 <br /> Project: Warner Avenue improvements Project Revision: 5/2/2023 <br /> Project No.: 14-6802;18-6424; 20.6618 pate: 512123 <br /> Owner: City of Santa Ana <br /> Description of Work: Additional time for 2"water service at Mc.Donald and additional 12"1/ <br /> Saw cat asphalt and removal asphalt and base and digging trench <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT' AMOUNTS <br /> 0 $119A2 $162.78 $0.00 <br /> John Witliams(Operator) 716.52 <br /> Guillermo Saldana(Operator) 6 $119.42 $162.78 <br /> $99.94 $135.07 $0.00 <br /> Ramon Guillen(Foreman Mason) $555.42 <br /> Salvador Saldana(Labor IV) 6 �- $92.57 $125.81 <br /> Ricardo Guillen(Cement Mason) $93.83 $125.90 $0.00$562.98 <br /> Ramon Guillen Jr.(Mason) 6 $93.83 $125.90 <br /> $7125 $98.67 $0.00 <br /> Cruz Benavente Chan(App) $71.25 $98.67 $0 00 <br /> Peter Arroyo(App) $555.42 <br /> Jesus Gomez(Labor IV) 6 - $92.57 $125.81 <br /> $7i.25 $98.fi7 $0.00 <br /> Jorge Alejandres(Labor App IV) $0.00 <br /> 'Explain Additional Benefit: _SUBTOTAL $2,390.34 <br /> _M_U 20% $478.07 <br /> -- - - -- -_ -- - TOTAL LABOR $2,868.41 <br /> EQUIPMENT SBY OP TENDED <br /> P. S$Y OPP. OTHER EX <br /> Description HRS, HRS. COST COST COSTS' AMOUNTS <br /> 00 <br /> CAT 336EL Excavator $256.52 <br /> p $256.5fl $0.0fl <br /> CAT 345CL Excavator $47.87 <br /> CAT 415F Skip Loader 1 $47.87 <br /> CAT 45OF Backhoe Loader $83.95 $0.00 <br /> CAT 450E Backhoe Loader $83.95 $0.00 <br /> CAT 950H Loader $136.17 $0.00 <br /> $206.74 0'00 <br /> CAT 972H Loader 0.25 <br /> CAT 262D Skid Steer Loader 1 $4025 <br /> $38.72 $0.00 <br /> CAT CB24B Roller $0 00 <br /> Air Compressor 185 wlbreaker $36.28 <br /> Dump Truck 2 axle <br /> 4 $50.64 $202.56 <br /> Crew Truck 20000 LB $37.19 $0.00 <br /> titer ruck B 61 4 <br /> cAT 315E 4 - $61.38 $245.52 <br /> H 100 Hammer $19 84 $o tau <br /> *Explain Other Costs: SUBTOTAL $536.20 <br /> MU 15% $80.43 <br /> - - -- TOTAL EQUIPMENT $616.63 <br /> UNIT EXTENDED <br /> MATERIAL <br /> Description(Attach Invoice) UNITS CITY. PRICE AMOUNTS <br /> $0.00 <br /> Pending $0.00 <br /> SUBTOTAL $0`00 <br /> _ IA <br /> MU 15% _ $0.00 <br /> TOTAL MATERIAL $0.00 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS* AMOUNTS <br /> Sawcut 1 $250 00 250.00 $250.00 <br /> $0.00 <br /> *Explain Other Costs: SUBTOTAL $250.00 <br /> MU_15% $37.50 <br /> - - - - - TOTAL OTHER WORK $287.5fl <br /> If A e cord is Complete and Correct TOTAL LABOR $2,868,41 <br /> TOAL EQUIPMENT $616.63 <br /> TQTAi !AL $287-50 <br /> �,ItY 11 - 609 BOND 1% 7.26 24 <br /> t' Owner's RepresentatiJe TOTAL THIS PROPOSAL $ <br />