My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT 3D <br /> Report No.: <br /> Contractor; Lonerock,Inc. PCO#: <br /> Project: Warner Avenue Improvements Project Revision: 515 - <br /> Project No.: 14-6802; 1$-6424; 20-6618 Date: 515123 <br /> Owner: City of Santa Ana - <br /> Description of Work: Additional cost to install 12"valve <br /> Complete installation of 12"valve with trust bloc,and placing trust block at <br /> end of line with blowoff.Install 2 saddle 12"with2". <br /> HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> LABOR <br /> Name&Classification Ret3ular OT Regular OT BENEFIT* AMOUNTS <br /> 0 $11942 $162.78 $0.00 <br /> m . <br /> John Willia s(Operator) 162 78 $597.10 <br /> Guillermo Saldana(Operator) 5 $119.42 $0.00 <br /> Ramon Guillen (Foreman Mason) 9.94 $135.07 <br /> 5 $92,57 $125.81 $462.85 <br /> Salvador Saldana(Labor IV) $93 83 $125.90 $0.00 <br /> Ricardo Guillen{Cement Mason) $93 83 $125.90 $469.15 <br /> Ramon Guillen Jr.{Mason) 5 -' <br /> 67 25 $98 <br /> 71. , 0.00 <br /> Cruz Benavente Chan(App) $ $0 00 <br /> Peter Arroyo(App) $71.25 $98.67 <br /> Jesus Gomez(Labor IV) 5 < $92.57 $125.81 $4$0. <br /> Jorge Alejandres(Labor App IV) $71 25 $98.67 $0.00 <br /> $0.00 <br /> 'Explain Additional Benefit: SUBTOTAL $1,991.95 <br /> _MU 2D°fo $398.39 <br /> -- _- - - - TOTAL LABOR $2190.34 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENiED <br /> Description HRS. HRS_ COST COST COSTS AMOUNTS$00o <br /> CAT 336EL Excavator $187.52 <br /> 0 $256,50 $0.00 <br /> CAT 345CL Excavator47.87 $D 00 <br /> CAT 415F Skip Loader 0 -1- $ 3-95 <br /> $83-95 $0.00 <br /> CAT 450F Backhoe Loader $83 95 $0.00' <br /> CAT 450E Backhoe Loader $136.17 $0.00 <br /> GAT 950H Loader $206 74 $0.00 <br /> CAT 972H Loader 5 $40.25 $201.25 <br /> CAT 262D Skid Steer Loader 8 72 $0.00 <br /> $3 <br /> CAT CB24B Roller $0.00 <br /> $3 <br /> Air Compressor 185 wlbreaker 628 <br /> 64 0.00 <br /> Dump Truck 2 axle 0 $ <br /> $37.19 $0.00 <br /> Crew Truck 20000 LB 5 <br /> Water I ruck0.00 <br /> C'.AT 315F 0 $61.38 <br /> H100 Hammer $19.54 .2 <br /> "Explain Other Costs: SUBTOTAL -$201. 5 <br /> MU 15°% _$30.19 <br /> - - - - TOTAL EQUIPMENT $231.44 <br /> UNIT EXTENDED <br /> MATERIAL <br /> Description(Attach Invoice) UNITS CITY PRICE AMOUNTS <br /> Saddle&all other feedin s&toper pi a EA 2 3,497.09 $6,994.18 <br /> 120.72 $0.00 <br /> SUBTOTAL $6,994.18 <br /> M_U_15% $1,049.13 <br /> TOTAL MATERIAL $8,043.31 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS* AMOUNTS <br /> Sawcut 0 $0.00 000 $0-00 <br /> $0.00 <br /> ' Explain Other Costs: SUBTOTAL $0.00 <br /> MU 15%_ $0-00 <br /> - TOTAL OTHER WORK 1 $0.00 <br /> If ove Record is Complete and Correct TOTAL LABOR $2.390-3Z <br /> TOAL EQUIPMENT $231.44 <br /> $043.31 <br /> City Co4g* 11 - 611 aoND 17,771 24 <br /> ` TOTAL THIS PROPOSAL 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.