My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST PROPOSAL <br /> Contractor: Lonerock,Inc. <br /> Project: Warner Avenue Improvements Project PCOM 34.0 <br /> Project No.: 14-6802;18-6424;20-6618 Revision: <br /> Owner: City of Santa Ana Date: 5/2->5112123 <br /> Description of Work: _ Additional cost due to added 2"water services and additional cut in 12" <br /> Gate valve near McDonalds. 6 working days <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT* AMOUNTS <br /> John Williams(Operator) $119.42 $162.78 $0 00 <br /> Guillermo Saldana(Operator) 25 $119-42 $162.78 $2,985.50 <br /> Ramon Guillen Foreman Mason) $99A4 $135.07 $0.00 <br /> Salvador Saldana(Labor I 44 $92.57 $125.81 $4,073.08 <br /> Ricardo Guillen(Cement Mason) $93.83 $125 90 $0.00 <br /> Ramon Guillen Jr. (Mason) 49 $93 83 $125.90 S4,597.67 <br /> Cruz Benavente Chan(Labor II) $89.36 $119.74 $0.00 <br /> Jesus Gomez(Labor Iv) 49 $92.57 $125.81 S4,535 93 <br /> Jorge Alejandres(Lahore II) 4 $89 36 $119.74 $357.44 <br /> Explain Additional Benefit: SUBTOTAL $16,549.62 <br /> MU 20% $3,309.92 <br /> -- TOTAL LABOR $19,859.54 <br /> EQUIPMENT SBY OPP. SBY OPP, OTHER EXTENDED <br /> Description HRS. FIRS. COST COST COSTS` AMOUNTS <br /> CAT 336EL Excavator $187.52 $0.00 <br /> CAT 345CL Excavator $256.50 $0.00 <br /> CAT 415F SkipLoader 11 $47,87 $526.57 <br /> CAT 45OF Backhoe Loader $83.95 $0.00 <br /> CAT 450E Backhoe Leader 3 $83.95 $251.85 <br /> CAT 950H Loader 4 $136.17 $544,68 <br /> CAT 972H Loader $206,74 $0 00 <br /> CAT 262D Skid Steer Loadr 18 $40,25 $724.50 <br /> CAT Ce24B Roller 6 $38.72 $232.32 <br /> Generator $15 00 $0.00 <br /> Dump Truck 2 axle 22 $50.64 $1,114,08 <br /> Crew Truck 20000 LB 4 $37-19 $148.76 <br /> Water Truck 36000 LB 4 S45.04 $180,16 <br /> CAT 315F 16 $61.38 $982.08 <br /> H100 Hammer $19.84 $0.00 <br /> "Explain Other Costs: SUBTOTAL $4,705.00 <br /> MU 15% $705.75 <br /> i TOTAL EQUIPMENT $5,410,75 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS CITY. PRICE AMOUNTS <br /> Core and Main Materials LS 1 $7,893 59 $7,893 59 <br /> CMB Cy 4 $23.43 S93.72 <br /> Concrete Bags EA 43 $12 79 $549.97 <br /> Tack Coat EA 2 $76,48 $152 96 <br /> Asphalt Ton 12 $103.44 $1,241.28 <br /> Sand Cy 4 $31.55 $126.20 <br /> Traffic Control Day 6 $596.20 $3,57T20 <br /> Plates and Shoring Day 6 $2110.37 $1,262.22 <br /> SUBTOTAL $14,897.14 <br /> MU 15% $2,234.57 <br /> TOTAL MATERIAL $17,131.71 <br /> OtherlMisc.Work UNIT OTHER EXTENDED <br /> UNITS OTY. PRICE COSTS* AMOUNTS <br /> Sawcut LS 1 $1.435.00 $1,435.00 <br /> Explain Other Costs: SUBTOTAL $1,435.00 <br /> MU 10% $143.50 <br /> TOTAL OTHER WORK 1 $1,578.50 <br /> If Abov R r Is Complete and Correct TOTAL LABOR $19,859.54 <br /> � k �� TOTAL EQUIPMENT $5,410,75 <br /> Contracto epresentative TOTAL MATERIAL $17,131.71 <br /> TOTAL OTHER WORK $1,578.50 <br /> City COiAndtepresantative 11 T0&29-HIS PROPOSAL $44.4 /2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.