Laserfiche WebLink
DAILY EXTRA WORK REPORT <br /> Contractor: Lonerock, Inc. Report No.: 321 <br /> Project: Warner Avenue Improvements Project PCO#: 36.0 <br /> Project No.:14-6802; 18-6424; 20-6618 Revision. <br /> Owner: City of Santa Ana Date: 7/14123 <br /> Description of Work: Prepared connection for waterline on Maple St. Spent additionaf two <br /> hours for unknown utiities. <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT' AMOUNTS <br /> John Williams(Operator) 124.47 169.37 $0.00 <br /> Guillermo Saldana(Operator) 2 124 47 $169.37 $248.94 <br /> Ramon Guillen (Foreman Mason) $103 24 $139-90 $0 00 <br /> Salvador Saldana(Labor IV) $92.57 $125.81 $0.00 <br /> Ricardo Guillen Cement Mason) $97A3 $130 74 $0.00 <br /> Ramon Guillen Jr (Mason) $97 13 $130.74 $0.00 <br /> Cruz Benavente Chan (App) $94.54 $126 98 $0.00 <br /> Chris Avina(App) $58-08 $78.42 $0 00 <br /> Jorge Alejandres (Labor App) 2 $94 54 $126 98 $189 08 <br /> Explain Additional Benefit SUBTOTAL $438.02 <br /> MU 20% $87.60 <br /> TOTAL LABOR $525,62 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS' AMOUNTS <br /> CAT 336EL Excavator $231.50 0.00 <br /> CAT 345CL Excavator $317.25 $0.00 <br /> CAT 415F Skip Loader $59.78 $0.00 <br /> CAT 450F Backhoe Loader $110.94 $0.00 <br /> CAT 450E Backhoe Loader $102.95 $0.00 <br /> CAT 950H Loader $169.46 $0.00 <br /> CAT 972H Loader $304.23 $0.00 <br /> CAT 262D Skid Steer Loadr $54.27 $0 00 <br /> CAT CB24B Roller $50 19 $0 00 <br /> Generator $15.00 $0 00 <br /> Dump Truck 2 axle $73.34 $0 00 <br /> Crew Truck 20000 LB $54.71 $0 00 <br /> Water Truck 36000 LB $63.46 $0.00 <br /> CAT 315F 2 $75.53 $151 06 <br /> ammer <br /> *Explain Other Costs- SUBTOTAL $151.06 <br /> _ MU 15% $22,66 <br /> TOTAL EQUIPMENT $173.72 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS OTY PRICE AMOUNTS <br /> Pending $0 00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> MU 15% $0.00 <br /> TOTAL MATERIAL $0.00 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS OTY. PRICE COSTS' AMOUNTS <br /> Pending <br /> Pending <br /> Explain Other Costs. SUBTOTAL $0.00 <br /> _ MU 15% $0.00 <br /> - TOTAL OTHER WORK $0.00 <br /> If o Record^is Complete and Correct TOTAL LABOR $525.62 <br /> TOAL EQUIPMENT $173.72 <br /> C actor's Representative TOTAL MATERIAL $0.00 <br /> } BOND 9% $6.99 <br /> City cb y%representative 1 1 TC�'4t THIS PROPOSAL 57 P21024 <br />