My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST PROPOSAL <br /> Contractor: Lonerock, Inc. <br /> Project: Warner Avenue Improvements Project PCOM 40.0 <br /> Project No.: 14-6802; 18-6424; 20-6618 Revision: 1 <br /> Owner: City of Santa Ana Date: 9/12 to 10/20123 <br /> Description of Work: Additional Cost for changing elevation per RFI 60. City requested <br /> elevation change from CB#10 to Sta.26+00. Excavated CMB+1-2"to make adjustment ! W. Days <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT" AMOUNTS <br /> Guillermo Saldana(Operator) 2 $124.47 $169.37 $248,94 <br /> Ramon Guillen (Foreman Mason) 6.5 $103.24 $139.90 $671 06 <br /> Manuel Maldonado (Labor IV) 2 $96.90 $130.53 $193.80 <br /> Ricardo Guillen (Cement Mason) 3 $97.13 $130.74 $291.39 <br /> Ramon Guillen Jr. (Mason) 1.5 $97.13 $130.74 $145 70 <br /> Cruz Benavente Chan(Labor 3) 6.5 $94.54 $126.98 $614,51 <br /> Chris Avina (Labor Apprentice) 1.5 $58.08 $78.42 $87.12 <br /> Jorge Alejandres(Laborer 3) 6.5 $94.54 $126.98 $614,51 <br /> "Explain Additional Benefit: SUBTOTAL $2,867.03 <br /> MU 20% $573.41 <br /> TOTAL LABOR $3,440-43 <br /> EQUIPMENT SBY Opp. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS* AMOUNTS <br /> CAT 336EL Excavator $231.50 $0.00 <br /> CAT 345CL Excavator $317.25 $0.00 <br /> CAT 415F Skip Loader $59.78 $0.00 <br /> CAT 450F Backhoe Loader $110-94 $0.00 <br /> CAT 450E Backhoe Loader $102.95 $0.00 <br /> CAT 950H Loader $169.46 $0.00 <br /> CAT 972H Loader $304.23 $0.00 <br /> CAT 262D Skid Steer Loadr 3 $54-27 $162.81 <br /> CAT CB24B Roller $50 19 $0.00 <br /> Generator $15.00 $0.00 <br /> Dump Truck 2 axle 3 $73.34 $220.02 <br /> Crew Truck 20000 LB 6.5 $54.71 $355.62 <br /> Water Truck 36000 LB $63.46 $0,00 <br /> CAT 315F 3.5 $75.53 $264.36 <br /> H100 Hammer $19,84 $0.00 <br /> Explain Other Costs? SUBTOTAL $1,002 80 <br /> MU 15%a $150.42 <br /> TOTAL EQUIPMENT $1,153.22 <br /> MATERIAL UNIT EXTENDED <br /> Description (Attach invoice) UNITS QTY. PRICE AMOUNTS <br /> Traffic Control DAY 1 $596.20 $596.20 <br /> SUBTOTAL $596.20 <br /> MU 15% $89.43 <br /> TOTAL MATERIAL $685.63 <br /> OtherlMisc.Work UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS` AMOUNTS <br /> $0.00 <br /> Explain Other Costs: SUBTOTAL $0.00 <br /> $0.00 <br /> TOTAL OTHER WORK $0.00 <br /> 4 Above Record is Complete and Correct TOTAL LABOR $3,440 43 <br /> _ TOTAL EQUIPMENT $1,153.22 <br /> sentative TOTAL MATERIAL $685.63 <br /> TOTAL OTHER WORK $0.00 <br /> Rnlun I- 552.79 <br /> City OUPe is Represenlat,e 11 - 680 TOTAL THIS PROPOSM21/202432 07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.