My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br /> www.santa-ana.org/public-works <br /> Item # 10 <br /> City of Santa Ana <br /> 20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br /> May 21, 2024 <br /> TOPIC: SA-5 Vault Modifications <br /> AGENDA TITLE <br /> Approve Additional Funds in the Amount of$270,000 for the SA-5 Vault Modifications <br /> Project with an Estimated Project Delivery Cost of$2,257,050 for the SA-5 Vault <br /> Modifications Project (Project No. 11-6413) (Non-general Fund) <br /> RECOMMENDED ACTION <br /> 1. Approve an amendment to the Project Cost Analysis in the amount of $270,000 <br /> for $240,000 in additional contingency funds and $30,000 in additional contract <br /> administration, inspection, and testing for a new estimated total construction <br /> delivery cost of$2,257,050. <br /> 2. Approve an amendment to the Fiscal Year 2023-24 Capital Improvement <br /> Program to include $270,000 of Acquisition & Construction funds for the First SA- <br /> 5 Vault Modifications Project (11-6413). <br /> GOVERNMENT CODE U4308 APPLIES: Yes <br /> DISCUSSION <br /> The SA-5 vault is one of seven connections between the City and Metropolitan Water <br /> District (MWD). The connection safeguards MWD water and ensures reliability of <br /> drinking water for residents and businesses, especially should there be an emergency <br /> or if the water system is interrupted. The goal of the project is to refurbish the existing <br /> piping, valves, equipment, and relocate the vault for easier access to minimize traffic <br /> impacts during routine maintenance along Bristol Street between Garry Avenue and <br /> Alton Avenue (Exhibit 1). <br /> On April 2, 2019, the City Council authorized the award of a construction contract to T.E <br /> Roberts, Inc. to improve the existing conditions of the SA-5 vault (Exhibit 2). The <br /> project is currently under construction and additional MWD modification change orders <br /> relating to the control systems have surpassed the existing contingency of $229,275 <br /> (Exhibit 3). Additional contingency will also be needed for future potential unforeseen <br /> work as the project progresses to completion. <br /> To capitalize on the favorable pricing of the existing contract with T.E. Roberts, Inc., <br /> Staff recommends increasing the project contingency by $270,000 which includes the <br /> City Council 10 — 1 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.