My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST PROPOSAL <br /> Contractor: Lonerock, Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 44.0 <br /> Project No.: 14-6802; 18-6424; 20-6618 Revision: <br /> Owner: City of Santa Ana Date: 1117122 <br /> Description of Work: Rail Modifications material costs <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT" AMOUNTS <br /> Guillermo Saldana(Operator) $124.47 $169.37 $0.00 <br /> Ramon Guillen Foreman Mason) $103.24 $139.90 $0.00 <br /> Manuel Maldonado(Labor IV) $96.90 $130,53 $0.00 <br /> Ricardo Guillen Cement Mason) $97.13 $130 74 $0.00 <br /> Ramon Guillen Jr Mason $97.13 $130-74 $0 00 <br /> Cruz Benavente Chan (Labor 3) $94.54 1 $126 98 $0 00 <br /> Chris Avina Labor A prentice) $58.08 1 $78 42 $0.00 <br /> Jorge Alejandres (Laborer 3) 1 $94.54 1 $126.98 $0.00 <br /> Explain Additional Benefit: SUBTOTAL $0.00 <br /> _ MU 20% $0_00 <br /> -- - - TOTAL LABOR $0.00 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST I COSTS* AMOUNTS <br /> CAT 336EL Excavator $231.50 $0.00 <br /> CAT 345CL Excavator $317-25 $0.00 <br /> CAT 415F Skip Loader $59.78 $0.00 <br /> CAT 45OF Backhoe Loader $110.94 $0.00 <br /> CAT 450E Backhoe Loader $102.95 $0 00 <br /> CAT 950H Loader $169 46 $0.00 <br /> CAT 972H Loader $304.23 $0.00 <br /> CAT 262D Skid Steer Loadr $54.27 $0.00 <br /> CAT CB24B Roller $50.19 $0 00 <br /> Generator $15 00 $0 00 <br /> Dump Truck 2 axle $73.34 $0.00 <br /> Crew Truck 20000 LB $54.71 $0.00 <br /> Water Truck 36000 LB $63 46 $0 00 <br /> CAT 315F $75,53 $0.00 <br /> H100 Hammer $19-84 $0.00 <br /> Explain Other Costs: SUBTOTAL $0.00 <br /> nnu ts�,6 $a 00 <br /> TOTAL EQUIPMENT $0 00 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS QTY, PRICE AMOUNTS <br /> Modifications LS 1 $6,334.90 $6,334.90 <br /> 0 $0.00 <br /> SUBTOTAL $6,334.90 <br /> MU 15% <br /> TOTAL_ MATERIAL $7,285.14 <br /> OtheriMisc.Work UNIT I OTHER EXTENDED <br /> UNITS QTY PRICE COSTS* AMOUNTS <br /> $0.00 <br /> "Explain Other Costs: SUBTOTAL $0.00 <br /> MU 10% $_0.00 <br /> TOTAL OTHER WORK $0.00 <br /> If Above Record is Complete�iqd Correct TOTAL LABOR $0.00 <br /> TOTAL EQUIPMENT $0.00 <br /> Contractor's Rep ntabve TOTAL MATERIAL $7,285-14 <br /> TOTAL OTHER WORK $0.00 <br /> BOND 1% $72.85 <br /> City COUR&,'s Representative 11 - 685TOTAi_ THIS PRUPUNAL51217FF5 <br /> 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.