Laserfiche WebLink
COST PROPOSAL <br /> Contractor: Lonerock, Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 46.0 <br /> Project No.: 14-6802; 18-6424; 20-6618 Revision: <br /> Owner: City of Santa Ana Date: 112/24 <br /> Description of Work: Additional Cost to dispose of AC waterline pipe which could not <br /> be protected in place per plans. <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT" AMOUNTS <br /> Guillermo Saldana (Operator) 0 $124.47 $169 37 $0.00 <br /> Trenton Hong(App. Operator) $78 93 $105-19 $0.00 <br /> Ramon Guillen (Foreman Mason) 0 $103.24 $139.90 $0.00 <br /> Manuel Maldonado(Labor IV) $96.90 $130.53 $0.00 <br /> Ricardo Guillen(Cement Mason) $97.13 1 $130.74 $0.00 <br /> Ramon Guillen Jr. (Mason) L$93 $130.74 $0,00 <br /> Cruz Benavente Chan (Labor 3) 0 4 $126 98 $000 <br /> Chris Avina(Labor Apprentice) 0 8 $78.42 $000 <br /> Jorge Alejandres(Laborer 3) 4 $126.98 $0 00 <br /> Explain Additional Benefit' SUBTOTAL $0.00 <br /> MU 20% _ $0.00 <br /> TOTAL LABOR $0.00 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS" AMOUNTS <br /> CAT 336EL Excavator 0 $231.50 $0.00 <br /> CAT 345CL Excavator 0 $31T25 $0.00 <br /> CAT 415E Skip Loader 0 $59.78 $0.00 <br /> CAT 45OF Backhoe Loader 0 $110.94 $0.00 <br /> CAT 450E Backhoe Loader 0 $102.95 $0.00 <br /> CAT 950H Loader 0 $169A6 $0.00 <br /> CAT 972H Loader 0 $304.23 $0.00 <br /> CAT 262D Skid Steer Loadr 0 $54.27 $0.00 <br /> CAT CB24B Roller 0 $50.19 $0.00 <br /> Generator 0 $15.00 $0.00 <br /> Dump Truck 2 axle 0 $73.34 $0.00 <br /> Crew Truck 20000 LB 0 $54 71 $0 00 <br /> Water Truck 30664 <br /> CAT 5 5 <br /> H 100 Hammer 0 $19.84 $0.00 <br /> Explain Other Costs- SUBTOTAL $0.00 <br /> MU 15% $0 00 <br /> TOTAL EQUIPMENT $0.00 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS QTY. PRICE AMOUNTS <br /> 0.00 <br /> o $0.00 <br /> SUBTOTAL $0.00 <br /> MU 15% $0.00 <br /> TOTAL MATERIAL $0 00 <br /> Other/Misc.Work UNIT OTHER EXTENDED <br /> UNITS CITY, PRICE COSTS' AMOUNTS <br /> AC Pipe Disposal LS 1 $5,088.75 $5,088.75 <br /> $0.00 <br /> Explain Other Costs SUBTOTAL $5,088,75 <br /> MU 10% $508.88 <br /> TOTAL OTHER WORK( $5,597.63 <br /> If Above Record is Complete and Correct TOTAL LABOR $0.00 <br /> I i TOTAL EQUIPMENT $0.00 <br /> Z(JaekAi-Representafive TOTAL MATERIAL $0.00 <br /> TOTAL OTHER WORK $5,597.63 <br /> BOND 1% $55 98 <br /> City CiOU`F'TCKlrs Representati"e 11 - 6890TAL THIS PROPOSAL 5/217�, RW <br />