Laserfiche WebLink
COST PROPOSAL <br /> Contractor: Lonerock, Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 47.0 <br /> Project No.: 14-6802; 18-6424; 20-6618 Revision: <br /> Owner: City of Santa Ana Date: 11/20/23 <br /> Description of Work: T&M for soil disposal not belonging to this project <br /> City requested to dispose soil between Cypress Street and Alley. 1 W. Days <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name& Classification Regular OT Regular OT BENEFIT' AMOUNTS <br /> Guillermo Saldana(Operator) 5 $124,47 $169 37 $622 35 <br /> Ramon Guillen Foreman Mason) $103.24 $139 90 $0.00 <br /> Manuel Maldonado(Labor tV) $96 90 $130.53 $0.00 <br /> Ricardo Guillen (Cement Mason) $97.13 $130-74 $0.00 <br /> Ramon Guillen Jr (Mason) $97.13 $130.74 $0.00 <br /> Cruz Benavente Chan(Labor 3) $94.54 $126.98 $0 00 <br /> Chris Avina(Labor Apprentice) $58 08 $78.42 $0 00 <br /> Jorge Ale)andres(Laborer 3) $94 54 1 $126.98 $0.00 <br /> 'Explain Additional Benefit: SUBTOTAL $622.35 <br /> MU 20% $124.47 <br /> TOTAL LABOR $746.82 <br /> EQUIPMENT SBY Opp. SBY OPP OTHER EXTENDED <br /> Description HRS. HRS- COST COST COSTS` AMOUNTS <br /> CAT 336EL Excavator $231 50 $0 00 <br /> CAT 345CL Excavator 5 $317.25 $1,586.25 <br /> CAT 415F Skip Loader $59 78 $0.00 <br /> CAT 450F Backhoe Loader 1 $110,94 $0.00 <br /> CAT 450E Backhoe Loader $102,95 $0.00 <br /> CAT 950H Loader $169A6 $0.00 <br /> CAT 972H Loader $304.23 $0 00 <br /> CAT 262D Skid Steer Loadr $54.27 $0 00 <br /> CAT CB24B Roller $50 19 $0.00 <br /> Generator $15.00 $0.00 <br /> Dump Truck 2 axle $73.34 $0.00 <br /> Crew Truck 20000 LB $54.71 $0.00 <br /> Water Truck 36000 LB $63 46 $0.00 <br /> CAT 315F $75 53 $0 00 <br /> H100 Hammer $19 84 1 $0.00 <br /> Explain Other Costs: SUBTOTAL $1,586,25 <br /> MU $237 94 <br /> TOTAL EQUIPMENT $1,824.19 <br /> MATERIAL UNIT EXTENDED <br /> Description (Attach Invoice) UNITS QTY. PRICE AMOUNTS <br /> 0 $0,00 <br /> © $0.00 <br /> SUBTOTAL $0.00 <br /> MU 150% $0.00 <br /> TOTAL MATERIAL $0.00 <br /> OthertMisc.Work UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS' AMOUNTS <br /> Soil Transport LS 14 $305.00 $4,270.00 <br /> `Explain Other Costs: SUBTOTAL $4,270.00 <br /> M U 10% $427.00 <br /> - TOTAL OTHER WORK $4,697.00 <br /> If Above Rec rd is Complete and Correct TOTAL LABOR $746,82 <br /> TOTAL EQUIPMENT $1,824 19 <br /> co a epr sentative TOTAL MATERIAL $0.00 <br /> TOTAL OTHER WORK $4,697-00 <br /> BOND 1% $72.68 <br /> City COuli nlFrs Representative 11 - 692 /21&ON <br /> .69 <br />