My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THUMPSUFF""' QUOTATION <br /> Page 1 of 2 <br /> R I F' E G R Q U P <br /> LOE FINGG !_ GS <br /> Quote Number. 60482 <br /> 101111 Laurel A:c.Rialto.CA 52177 1909.a12.0200 i 909022,900 Fax <br /> nr:r.thompsanpipegroup.torr► Quote Date. 2/1/2021 <br /> Date Printed: 2/112021 <br /> To: LONEROCK INC. Attn:DRAGAN Bid Date/Time: Feb 2 2021 12-00AM <br /> 2:00 PM <br /> Job Name: Project No.20-6618 Warner Ave SD Improvements Main St to Oak St Location: Santa Ana <br /> Address: City: Santa Ana Job ID: 20714 <br /> We propose to furnish all of the materials andlor services fisted herein for this project,subject to KTI,Incorporated,a California Corporabon,dba Thompson Pipe Group-Los <br /> Angeles TERMS AND CONDITIONS dated 01/01121 that shall control and take precedence over any terms and conditions to the contrary in any purchase order or other document. <br /> All quantities are approximate,and are not to be considered as a guaranteed Bill of Materials.Prices are quoted without the benefit of plans and specifications.Unit prices will prevail <br /> on all actual quantities of materials supplied. All weights are theoretical and may vary If City of Los Angeles pipe is not quoted as such,a mandatory surcharge will apply.Prices <br /> quoted are firm for 30 days past quote date.Thereafter,prices are subject to review.Thompson Pipe Group-Los Angeles does not warranty any type of air testing of pipe joints.An <br /> additional service provider fee will apply for all credit card payments.QUOTE IS BASED ON RECEIVING A FULL ORDER FOR ALL LINE ITEMS QUOTED BELOW. <br /> NOTES: QUOTED PER COMBINED PLANS <br /> NOTES: cast in place box culvert for lateral connection sta 17+37 to SU 17-+•45 <br /> NOTES: 24 RCP LOADS+150 RCB LOADS = 174 TOTAL LOADS <br /> Item Description Additional Information <br /> 1.00 272.00 FT 18"2000-D w/ 1.50 SC $18.18 $4,944.96 <br /> 2.00 64.00 FT 24"2000-D w/ 1.50 SC $22.61 $1,447.04 <br /> 3.00 48.00 FT 48"2000-D w/Liftholes $82.00 $3,936.00 <br /> 4.00 400.00 FT 60"2000-D w/ Liftholes $113.91 $45,564.00 <br /> 5.00 112.00 FT 60"1500-D RG w/RG $114.01 $12,769.12 <br /> 6.00 44.00 FT 66" 1500-D RG w/RG $135,31 $5,953.64 <br /> � Ip8y I ' 6a z.�- <br /> See Last Page Con't Next Page <br /> See Last Page See Last Page <br /> See Last Page <br /> Availability: Delivery is subject to change,Prior to receipt of a signed order,approved plans,and preliminary information. <br /> QUOTING TONGUE&GROOVE MORTAR JOINT STORM DRAIN PIPE,UNLESS NOTED. <br /> UNLESS NOTED,PRICES ARE DELIVERED,EXCLUDING ALL APPLICABLE TAXES. <br /> ALL MANHOLES AND APPURTENANCES,4'LONG BEVELED PIPE,ALL RUBBER GASKET PIPE,THICKWALL,AS WELL AS ALL PIPE 90"AND LARGER IS REQUIRED <br /> TO BE OFF-LOADED BY CUSTOMER <br /> UNLESS NOTED,ALL R.G.PIPE IS QUOTED AS STRAIGHT PIPE WITH POLYISOPRENE RUBBER GASKETS.CUSTOMER TO OFF-LOAD ALL R.G.PIPE <br /> Accepted By: BRAD OIEN -- <br /> For: For Thompson Pipe Group-Los Angeles , 11 <br /> Fax: (909)822-9630 W� <br /> Date: �� <br /> EMail: <br /> brad.oien@thompsonpipegroup.com <br /> Date: <br /> City Council 11 706 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.