My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST PROPOSAL <br /> Contractor: Lonerock, Inc. <br /> Project: Warner Avenue Improvements Project PCO#: 49.0 <br /> Project No.: 14-6802; 18-6424; 20-6618 Revision: <br /> Owner: City of Santa Ana Date: 1/10/24 <br /> Description of Work: T&M additional work for sewer line repair to Wells Fargo <br /> Directed by City to perform this work 4 W.Days <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT* AMOUNTS <br /> Guillermo Saldana(Operator) 6 $124 47 $169.37 $746.82 <br /> Trenton Hong(App. Operator) $78.93 $105.19 $0.00 <br /> Ramon Guillen (Foreman Mason) 1 $103.24 $139.90 $103.24 <br /> Manuel Maldonado(Labor IV) $96,90 $130.53 $0.00 <br /> Ricardo Guillen (Cement Mason) $97 13 1 $130 74 $0.00 <br /> Ramon Guillen Jr (Mason) $97.13 $130 74 $0.00 <br /> Cruz Benavente Chan (Labor 3) 2 $94.54 $126.98 $189,08 <br /> Chris Avina(Labor Apprentice) 6 $58.08 $78.42 $348.48 <br /> Jorge Alejandres(Laborer 3) $94.54 $126.98 $0.00 <br /> 'Explain Additional Benefit: SUBTOTAL $1,387.62 <br /> MU 20% $277.52 <br /> TOTAL LABOR $1,665.14 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS* AMOUNTS <br /> CAT 336EL Excavator 0 $231,50 $0 00 <br /> CAT 345CL Excavator 0 $317.25 $0 00 <br /> CAT 415F Skip Loader 0 $59.78 $0.00 <br /> CAT 450F Backhoe Loader 0 1 $110,94 $0.00 <br /> CAT 450E Backhoe Loader 0 $102.95 $0 00 <br /> CAT 950H Loader 0 $169 46 $0 00 <br /> CAT 972H Loader 0 $30423 $0.00 <br /> CAT 262D Skid Steer Loadr 8 $54.27 $434.16 <br /> CAT CB24B Roller 0 $50.19 $0.00 <br /> Generator 0 $15.00 $0.00 <br /> Dump Truck 2 axle 0 $73.34 $0.00 <br /> Crew Truck 20000 LB 0 $54.71 $0.00 <br /> Water Truck 36000 LB $6146 <br /> AT 315F $79.63 <br /> H100 Hammer 3 1 $19.84 1 $59.52 <br /> *Explain Other Costs- _SD !TOTAL $493.68 <br /> _MU 15% $74.05 <br /> TOTAL EQUIPMENT $567. 33 <br /> MATERIAL UNIT EXTENDED <br /> Description (Attach Invoice) UNITS CITY_ PRICE AMOUNTS <br /> CMB CY 1 $23.43 $23 43 <br /> 0 $0.00 <br /> SUBTOTAL $23.43 <br /> MU 15% $3,51 <br /> TOTAL MATERIAL $26.94 <br /> Other/Misc.Work UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS* AMOUNTS <br /> Soil Disposal LS 0 $305.00 $0.00 <br /> * Explain Other Costs: SUBTOTAL $0,00 <br /> MU 15% $0.00 <br /> TOTAL OTHER WORK $0.00 <br /> If A ove Record is Complete and Correct TOTAL LABOR $1,665 14 <br /> TOTAL EQUIPMENT $567 73 <br /> ICNK410ts Representative TOTAL MATERIAL $26.94 <br /> TOTAL OTHER WORK $0 00 <br /> BOND 1% $2222,.a6�0 <br /> City COt9MIf Representative 11 - 71TpTAL THIS PROPOSAL 5/2141MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.