Laserfiche WebLink
CITY OF SANTA ANA <br /> Contractor shall provide City a full report of damage to City property and/or equipment by <br /> Contractor's employees. All damage reports shall be submitted to the Site Coordinator within <br /> twenty-four (24) hours of occurrence. <br /> Contractor shall provide, erect, and maintain all warning devices (i.e., barricades, cones, etc.) as <br /> required or necessary to ensure the safety of the public, City, and Contractor's employees <br /> D. CONSTRUCTION WASTE MANAGEMENT: Contractor shall keep work areas clean and free <br /> from any debris, rubbish, hazardous waste and non-usable material resulting from the work under <br /> this Contract and shall be disposed of at the completion of each work day by the Contractor. <br /> Hazardous waste must be disposed of in accordance with the Resource Conservation and <br /> Recovery Act and all other applicable federal, state, and local laws and regulations. <br /> RFFPU.929 A Digital Marquees for MMpT"e2L%cations 5/21/2024 <br />