My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Agreement for Public Works Cost Recovery Analysis Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 30 - Agreement for Public Works Cost Recovery Analysis Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:10:27 PM
Creation date
5/29/2024 6:08:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
30
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERABLES <br />Currently the city does not <br />i ~ + The methodology to <br />meet Cal -trans requirements <br />I <br />produce targeted <br />for hourly billing to projects_ <br />hours, will resulting in <br />• GCP will develop a <br />hourly rates for each <br />management and technical <br />staff member. <br />methodology for gathering <br />• This methodology will <br />the necessary data to meet <br />be review monthly to <br />Caltrans requirements <br />ensure accurate data at <br />yearend. <br />I. GCP will review and analyze <br />the user fee services charged <br />based on fixed fee and variab <br />fee methods. <br />IMPLEMENTATION PLAN and SCHEDULE <br />• The study will result in <br />calculations, reports and <br />presentations explaining and <br />implementing the results. <br />• All technical reports will be <br />delivered to the city based on <br />excel models -- easily updated <br />and repeatable by city staff. <br />Oe-------1i►• <br />---------Months2-4— <br />, <br />Months 1-2 = � _ _ _ _ _ e = _ _ _ i As needed for 12 <br />months of solid <br />timesheet data <br />DEVELOP COSTING <br />MEET W CITY <br />METHODOLOGIES <br />FINALIZE PLAN <br />Develop full cost of <br />Finalize plans and <br />services covered by <br />project scope and <br />start the project. <br />plan for maximum <br />recovery. <br />03. <br />REPORT AND <br />PRESENT RESULTS <br />Monitor then develop <br />Oreports and present <br />results. <br />04. <br />IMPLEMENT <br />AND MONITOR <br />OImplement and <br />monitor results <br />Government Consulting Partners �Ij City of Santa Ana PW Proposal 19 <br />111�1_ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.