My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Harbor Boulevard Innovative Corridor Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 27 - Harbor Boulevard Innovative Corridor Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:08:31 PM
Creation date
5/29/2024 6:10:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
27
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C-3-3023 <br />HARBOR BOULEVARD CONNECTED CORRIDOR PROJECTS <br />E. The AUTHORITY, or agents of the AUTHORITY, shall manage, procure, implement, and <br />complete all aspects of the PROJECT as identified in the APPLICATIONS, including filing all <br />documentation necessary to comply with the requirements of the SMART, REAP, and TIRCP guidelines <br />and funding reporting. <br />F. The AUTHORITY, or its agents, shall collect all data necessary to deliver the PROJECT, <br />as specified in the APPLICATIONS. <br />G. The AUTHORITY, or its agents, shall coordinate outreach activities with <br />PARTICIPATING AGENCIES for the PROJECT. <br />H. The AUTHORITY, or its agents, shall study, evaluate, and recommend TSP and ITS <br />ELEMENTS best suited for the desired operation by each Party. <br />I. The AUTHORITY, or its agents, shall provide construction management oversight during <br />the construction of the PROJECT. <br />J. The AUTHORITY, or its agents, shall prepare the PROJECT reports, plans, and materials <br />that will be shared with PARTICIPATING AGENCIES and other PROJECT stakeholders. <br />ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />and funding of the PROJECT: <br />A. The PARTICIPATING AGENCIES shall provide a technical representative to <br />participate as a member of the PROJECT's Project Development Team (PDT). <br />B. The PARTICIPATING AGENCIES shall authorize the AUTHORITY to manage, <br />procure, and implement all aspects of the PROJECT. <br />C. The PARTICIPATING AGENCIES shall participate and support the PROJECT <br />implementation within the timeframe outlined in the APPLICATION and consistent with the SMART, <br />REAP, and TIRCP guidelines adopted by the AUTHORITY. <br />D. The PARTICIPATING AGENCIES shall provide AUTHORITY, or its agents all current <br />Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.