Laserfiche WebLink
RFP #24-038A: On -Call Environmental Review Services for CHAMBERS <br />the Housing Division GROUP <br />City of Santa Ana <br />based on the City CEQAAssessment—VMT Analysis Guidelines. If necessary, LLG will recommend appropriate mitigation <br />measures to reduce the impact. They will provide the project team a toolbox of potential mitigation or project <br />alternatives for consideration in the analysis. Utilize the California Air Pollution Control Officers Association (CAPCOA) <br />standards or the local guidelines and determine if the selected mitigation measures reduce the project's VMT impacts <br />to less than significant. <br />LLG will prepare a draft memorandum, which details all the above -mentioned items, their findings, and conclusions. <br />The draft memorandum will be submitted for the City's review and review by appropriate members of the project team. <br />If necessary, they will update the draft memorandum based on Project team comments and submit a final VMT analysis <br />memorandum to the City. <br />Traffic Impact Analysis (TIA): LLG will confirm the development description of the proposed project with the project <br />team and work schedule. They will coordinate with City staff to confirm the scope of work for the TIA (i.e., number of <br />study intersections). <br />LLG will visit the project study area and inventory existing roadway conditions. They will research existing historical <br />traffic count data at the key study intersections located within the vicinity of the proposed project site. LLG will conduct <br />a.m. peak period and p.m. peak period manual turning movement counts at the key study intersections identified to <br />be evaluated by City staff. They will coordinate with City staff to obtain cumulative project information. <br />They will prepare trip generation forecasts for the proposed Project for a typical weekday over a 24-hour period, as <br />well as for the commuter a.m. and p.m. peak hours. The trip generation forecasts will either be estimated based on the <br />application of trip rates included in Trip Generation, 10th Edition, published by ITE (2017) or based on the operations <br />of the facility. <br />LLG will develop a.m. peak hour and p.m. peak hour "existing plus project", "near -term cumulative plus project" and <br />"long-term plus project" traffic volume projections for the key study intersections. They will prepare a.m. peak hour <br />and p.m. peak hour "existing plus project", "near -term cumulative plus project" and "long-term plus project" Level of <br />Service (LOS) calculations at the key study intersections. Where necessary, the traffic study will identify the appropriate <br />intersection improvements to offset the proposed Project's traffic impacts. <br />LLG will then prepare a draft report that details all of the above -mentioned items, their analysis, findings, and <br />conclusions. The draft report will be submitted for review and review by appropriate members of the project team. If <br />necessary, the report will be updated based on project team comments, and a final report will be submitted to the City. <br />"= Est <br />1979 <br />23 <br />www.chambersgroupinc.com <br />