My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - On-Call Environmental Review Services for Federally Funded Programs
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 24 - On-Call Environmental Review Services for Federally Funded Programs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:08:15 PM
Creation date
5/29/2024 6:11:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
24
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP #24-038A: On -Call Environmental Review Services for <br />the Housing Division <br />City of Santa Ana <br />FEE SCHEDULE <br />Effective January 1, 2024 <br />rNIM <br />CHAMBERS <br />GROUP <br />Principals <br />Principal Engineer..............................................................................................$ 298.00 <br />Associate Principal Engineer..............................................................................$ 268.00 <br />Planning/Design Manager..................................................................................$ 249.00 <br />Transportation Engineers <br />Senior Transportation Engineer..........................................................................$ 226.00 <br />Transportation Engineer III................................................................................$ 200.00 <br />Transportation Engineer II.................................................................................$ 171.00 <br />Transportation Engineer I...................................................................................$ 147.00 <br />Transportation Planners <br />Senior Transportation Planner............................................................................$ 200.00 <br />Transportation Planner III.................................................................................. $ 171.00 <br />Transportation Planner II ....................................................................................$ 146.00 <br />Transportation Planner I.....................................................................................$ 130.00 <br />Signal System Specialist <br />Senior Signal System Specialist............................................................................$ 226.00 <br />Signal System Specialist III...............................................................................$ 200.00 <br />Signal System Specialist II................................................................................$ 171.00 <br />Signal System Specialist I..................................................................................$ 147.00 <br />Technical Support <br />Engineering Associate III...................................................................................$ 150.00 <br />Engineering Associate II................................................................................... $ 145.00 <br />Engineering Associate I......................................................................................$ 140.00 <br />Engineering Computer Analyst II.......................................................................$ 138.00 <br />Engineering Computer Analyst I........................................................................$ 109.00 <br />Senior CADD Drafter.........................................................................................$ 140.00 <br />CADD Drafter III...............................................................................................$ 130.00 <br />CADD Drafter II................................................................................................$ 115.00 <br />CADDDrafter I..................................................................................................$ 98.00 <br />Senior Engineering Technician ..........................................................................$ 140.00 <br />Engineering Technician II..................................................................................$ 130.00 <br />Engineering Technician I...................................................................................$ 99.00 <br />Word Processor/Secretary ..................................................................................$ 92.00 <br />EngineeringAide I.............................................................................................$ 70.00 <br />Public Hearing and litigation support may be charged at 125% of the base rate. Consultation in connection with litigation and <br />Court appearances will be quoted separately. <br />Project -related mileage will be billed at the prevailing standard mileage rate as determined by the IRS. Subcontractors and other <br />project -related expenses will be billed at cost plus 15%. <br />The above schedule is for straight time. Overtime will be charged at 1.50 times the standard hourly rates. <br />hLterim and/or monthly statements will be presented for completed work. These will be due and payable upon presentation <br />unless prior arrangements are made. A fmance charge of 1.5% maybe charged each month on the unpaid balance. <br />IQ MLI <br />2 Executive Circle <br />Suite 250 <br />Irvine, CA 92614 <br />949JO.6175 T <br />949.825.5939 F <br />www.ligengineers.com <br />Pasadena <br />Irvine <br />San Diego <br />David S. Shender, PE <br />John A. Boarman, PE <br />Richard E. Barrette, PE <br />Keil D. Maberry, PE <br />KC Yellapu, PE <br />Dave Roseman, PE <br />Shankar Ramakrishnan, PE <br />An LG2WB Company Founde <br />010 <br />Est <br />/�l�` 1979 www.chambersgroupinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.