Laserfiche WebLink
Top Five Priority Projects <br />The four exhibits on this page can be used as a guide for the first five <br />projects. Because a SCAG project is taking them further along, they are <br />kept to a conceptual level in this Plan. Exhibits A through D depict inter- <br />section and corridor treatment options for Main Street, Euclid Avenue, <br />1st Street, Tustin Avenue, and Greenville Street. Engineering drawings, <br />cost estimates, and renderings for these five projects can be found in <br />Appendix D. <br />Exhibit A. Intersection Enhancements <br />Potential features as applicable: <br />• Protected Intersection <br />• Truck Apron <br />• Hardened Centerline <br />• Corner Refuge Islands <br />• Traffic Signal - new or modification <br />• Bike Signal and Queue Area <br />• High -visibility crosswalks <br />• Dual curb ramps <br />Intersection Enhancements, sourced from Bicycle Dutch <br />Exhibit B . Pedestrian Hybrid Beacon <br />Potential features as applicable: <br />• Warn and control traffic at an unsignalized location to assist <br />pedestrians in crossing a street at a marked crosswalk <br />• Pedestrian push button <br />• Flashing lights with reflective border <br />• High -visibility crosswalk <br />Pedestrian Hybrid Beacon, Downtown Santa Ana <br />98 <br />