Laserfiche WebLink
#7. Fairview Street <br />Edinger Avenue to St. Andrew Place <br />Existing Conditions and Recommendations <br />Fairview Street from Edinger Avenue to St. Andrew Place is a one- <br />third mile stretch running north to south near the middle of the west <br />edge of the City. The Santa Ana College of Continuing Education and <br />Centennial Park is on the west side of the corridor and single family <br />housing and a grocery store on the east side. As a primary through - <br />road, it sees a daily large volume of traffic and high collisions rate with <br />two severe injuries at the intersection with Edinger Avenue during <br />the study period. A high quality pedestrian network of sidewalks, <br />curb ramps, and bus stops run along the street to support pedestrian <br />mobility but no bicycle facilities exist. High visibility crosswalks are <br />missing. Figure 6-8 shows recommended improvements that could <br />be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />O f Q� <br />1 0 2 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Fairview St (Edinger Ave - St Andrew <br />PI) <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost(2028Y <br />TOTAL CONSTRUCTION COST $ 3,552,994 <br />$ <br />4,322,760 <br />TOTAL RIGHT OF WAY COST $ 400,000 <br />$ <br />486,661 <br />TOTAL CAPITAL OUTLAY COSTS $ 3,953,000 <br />$ <br />4,810,000 <br />$ 500,000 <br />$ <br />610,000 <br />LD <br />$ 700,000 <br />$ <br />860,000 <br />RIGHT OF WAY (2%) <br />Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />112 <br />