My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - Santa Ana Vision Zero Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 32 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:37:15 AM
Creation date
5/29/2024 6:11:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
32
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.17th Street and Grand Avenue <br />Intersection Project <br />Existing Conditions and Recommendations <br />17th Street and Grand Avenue is a busy intersection in the upper <br />east quarter of the City with commercial retail at all corners. Five <br />vehicle lanes, not counting multiple turn lanes in each direction, are <br />on each leg of the intersection. Very high traffic volumes see similarly <br />high collision rates during the study period, with multiple severe <br />injuries near this intersection where raised medians are not provided. <br />Sidewalks, curb ramps, and bus stops are provided on both sides <br />of the street. No bicycle facilities are provided. Figure 6-13 shows <br />recommended improvements that could be extended farther along <br />the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />t d� <br />07br � <br />1 0 1 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Santa Ana Vision Zero <br />17th St and Grand Ave Intersection <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)** <br />TOTAL CONSTRUCTION COST $ 1,383,045 <br />$ 1,731,352 <br />TOTAL RIGHT OF WAY COST $ 40,000 <br />$ 48,666 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,424,000 <br />$ 1,781,000 <br />$ 180,000 <br />$ 220,000 <br />$ 250,000 <br />$ 310,000 <br />RIGHT OF WAY (2%) <br />made. <br />122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.