My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - Santa Ana Vision Zero Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 32 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:37:15 AM
Creation date
5/29/2024 6:11:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
32
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTAANA VISION ZERO PLAN <br />ProgramFunding <br />Submittal <br />.. <br />Eligible Phases <br />/Costs <br />Match Selection <br />Requirement Criteria <br />Sustainable <br />0 Annual call <br />Studies or Plans <br />11.47%-20% local GHG7 reduction, DAC, <br />Transportation <br />for projects <br />match housing, land use and <br />Planning Grants <br />0 March <br />transportation planning <br />deadline <br />FundingFederal <br />. <br />Rebuilding American <br />• Annual call <br />Planning <br />Federal cost share <br />Safety, environmental <br />Infrastructure with <br />for projects <br />Capital <br />may not exceed <br />sustainability, <br />Sustainability and <br />0 February <br />80% <br />quality of life, mobility and <br />Equity <br />deadline <br />community connectivity, <br />economic competitiveness, <br />Federal cost share <br />partnership, innovation <br />Regional economic, mobility, <br />Rural Surface <br />0 May <br />PA&ED <br />Transportation Grant <br />deadline <br />PS&E <br />may not exceed <br />or safety benefits <br />• ROW <br />80% <br />• CON <br />Strengthening <br />0 November <br />PA&ED <br />No match <br />Safety and reliability, <br />Mobility and <br />deadline <br />PS&E <br />requirement <br />resiliency, equity and access, <br />Revolutionizing <br />ROW <br />climate, partnerships, <br />Transportation <br />CON <br />integration <br />Safe Streets and <br />0September <br />0Planning <br />20% local match <br />DAC, Safety <br />Roads for All <br />deadline <br />• Implementation <br />Areas of Persistent <br />0 March <br />0 Planning <br />Minimum federal <br />DAC <br />Poverty <br />deadline <br />0 Engineering <br />share is 90% of <br />• Development <br />total project cost <br />of technical or <br />financial plans <br />Greenhouse Gas <br />Appendix D <br />
The URL can be used to link to this page
Your browser does not support the video tag.