Laserfiche WebLink
Santa Ana Vision Zero <br />Tustin Ave (17th St to Fairhaven Ave) <br />MARK THOMAS <br />(Corridor Safety Enhancements including: Median Islands, Bike Lanes, <br />Bike Crossings, <br />Curb Extensions, Directional Curb Ramps, Sidewalk Extensions and Bus Stop improvements) <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)* <br />TOTAL CONSTRUCTION COST $ 7,210,000 <br />$ <br />8,770,000 <br />TOTAL RIGHT OF WAY COST $ 300,000 <br />$ <br />370,000 <br />TOTAL CAPITAL OUTLAY COSTS $ 7,510,000 <br />$ <br />9,140,000 <br />$ 940,000 <br />$ <br />1,150,000 <br />LD <br />$ 1,320,000 <br />$ <br />1,610,000 <br />w <br />0 <br />RIGHT OF WAY (2%) <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made. <br />Appendix D <br />