My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - Santa Ana Vision Zero Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 32 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:37:15 AM
Creation date
5/29/2024 6:11:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
32
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution Approving the Santa Ana Vision Zero Plan <br />June 4, 2024 <br />Page 2 <br />The SAVZ Plan analyzed five years of traffic collision data between 2017 and 2021 to <br />identify collision patterns throughout the city. From the analyzed collision data, corridors <br />and intersections were ranked based on the density and severity of the collisions, <br />proximity to schools, number of street lanes, and equity. The SAVZ Plan identified the <br />top 10 corridors and top 10 intersections in the ranking. <br />Top 10 Corridors in Need of Traffic Safety <br />Enhancements <br />Corridor <br />Rankin <br />Main Street <br />1 <br />Euclid Avenue <br />2 <br />1 st Street <br />3 <br />Tustin Avenue <br />4 <br />Greenville Avenue <br />5 <br />Grand Avenue <br />6 <br />Fairview Street <br />7 <br />Bristol Street <br />8 <br />4t" Street <br />9 <br />17t" Street <br />10 <br />Top 10 Intersections in Need of Traffic Safety <br />Enhancements <br />Intersection <br />Rankin <br />Harbor Boulevard at 1 st Street <br />1 <br />17t" Street at Grand Avenue <br />2 <br />Harbor Boulevard at McFadden Avenue <br />3 <br />1 st Street at Flower Street <br />4 <br />Edinger Avenue at Maple Street <br />5 <br />Segerstrom Avenue at Bear Street <br />6 <br />Flower Street at Macarthur Boulevard <br />7 <br />Macarthur Boulevard at Raitt Street <br />8 <br />Dyer Road at Flower Street <br />9 <br />Flower Street at Alton Avenue <br />10 <br />The plan then assessed the factors associated with each collision along the identified <br />corridor and provided specific safety improvement recommendations to address the <br />types of collisions that occurred within those corridors. Additionally, cost estimates for <br />the recommended improvements of each project corridor were developed. These plans <br />and cost estimates will aid the City in pursuing future grant funding opportunities and to <br />facilitate implementation of safety features. Staff recommends the approval of this <br />resolution (Exhibit 2) in order to continue to pursue grant funding followed by the <br />implementation of the safety improvements presented in the SAVZ Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.