My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:16:56 PM
Creation date
5/29/2024 6:15:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 Maintenance And Rehabilitation Strategies <br />• Structural Overlay — Structural Overlays, which applies to moderate to severe pavement <br />cracking with little or no deficiency in the foundation layers, entails cold -milling / grinding <br />the surface to a depth of up to three inches for arterial streets and two inches for local <br />streets, removing localized failed areas, and placing a thick layer of hot -mixed AC <br />(typically four to five inches for arterial streets and three to four inches for local streets). <br />The new AC pavement section smooth the ride performance, improves skid resistance, <br />correct the crown and drainage features, increases pavement structural capacity. <br />• Cold -In -Place Recycling (CIR) — CIR, which applies to moderate to severe pavement <br />cracking with little or no deficiency in the pavement structure, is a process rehabilitating <br />pavement by recycling it in place. The top layer of pavement is removed with a milling <br />(grinding) machine to a specified depth (typically three to four inches). The removed <br />material is then crushed, sorted and mixed with a specially formulated asphalt emulsion. <br />This emulsion mixes with the milled pavement and acts as a binder to form the new CIR <br />pavement. This new mixture is placed on the roadway by a paver and compacted as a <br />new and more durable asphalt base course. Finally, a thin overlay of conventional asphalt <br />pavement is placed over the CIR to seal it and provide a new wear to improve ride <br />performance and drainage features and increase pavement structural capacity. <br />• Cement -Treated Base (CTB) — CTB is applicable when the distress evidence at the <br />surface indicates failure in the pavement structure or subgrade (the roadway completely <br />failed with crumbling surface pavement), which is not correctable by less extensive <br />construction. Due to its long curing time, this treatment method typically should be applied <br />to low -moderate traffic areas and/or moderate traffic areas with more than one lane per <br />direction with a low volume of large vehicles. CTB involves grinding the existing roadway <br />surface and base into pieces to a prescribed depth (typically 14 to 20 inches for arterial <br />streets and 8 to 11 inches for local streets), which are mixed with cement and water to be <br />used as a base course. A thin overlay of conventional asphalt pavement is then placed <br />over the CTB base to provide a new wear for improving ride performance and drainage <br />features and increase pavement structural capacity. <br />• Full Depth Reconstruction (FDR) — FDR is applicable when the distress evidence at the <br />surface indicates failure in the pavement structure or subgrade (the roadway completely <br />failed with crumbling surface pavement), which is not correctable by less extensive <br />construction. This treatment involves removal of existing layers of asphalt AC, PCC, <br />and/or base to a prescribed depth recommended by geotechnical engineering pavement <br />analysis and placement of conventional flexible pavement section. In general, local <br />residential and non-residential streets are removed to depths of six inches and eight <br />inches, respectively; a depth of 10 inches are removed on secondary arterial and collector <br />streets; a depth of 12 inches are removed on primary arterial streets; and a depth of 16 <br />inches are removed on major arterial streets. The actual depth depends on anticipated <br />traffic loading, soil conditions, and roadway functional classifications. This treatment is by <br />far the most expensive form of M&R strategies to increase pavement structural capacity. <br />City of Santa Ana 2024 Pavement Management Program 4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.