My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#6. Grand Avenue <br />Century High School to Edinger Avenue <br />Existing Conditions and Recommendations <br />Grand Avenue from Century High School to Edinger Avenue is a <br />one-third mile stretch running north to south at the southeast edge of <br />the City with Century High School on the east side of the street and <br />light industry on the west side of the street. Light commercial retail <br />is located at the intersection with Edinger Avenue. A moderate level <br />of traffic and collisions occur on this stretch with one severe injury at <br />the intersection with Edinger Avenue during the study period. A high <br />quality pedestrian network of sidewalks, curb ramps, and bus stops <br />run along the street to support pedestrian mobility but no bicycle <br />facilities exist. High visibility crosswalks are missing. Figure 6-7 shows <br />recommended improvements that could be extended farther along <br />the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />O f Q� <br />0 0 2 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Grand Ave (Century HS - Edinger Ave) <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 4,568,769 <br />$ <br />5,558,607 <br />TOTAL RIGHT OF WAY COST $ 210,000 <br />$ <br />255,497 <br />TOTAL CAPITAL OUTLAY COSTS $ 4,779,000 <br />$ <br />5,815,000 <br />$ 600,000 <br />$ <br />730,000 <br />LD <br />$ 840,000 <br />$ <br />1,030,000 <br />RIGHT OF WAY (2%) <br />Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.