My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.17th Street <br />Ross Street to Broadway <br />Existing Conditions and Recommendations <br />17th Street from Ross Street to Broadway is a one-third mile segment <br />running along the north edge of downtown Santa Ana. Land uses are <br />primarily commercial retail and one apartment complex. As a primary <br />route through the City, it supports high traffic volumes and has <br />high collision rates with one fatality at the Ross Street intersection. <br />Sidewalks, curb ramps, and bus stops are provided on both sides <br />of the street but no bicycle facilities. High visibility crosswalks are <br />missing. Figure 6-11 shows recommended improvements that could <br />be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />�tA <br />d� <br />07br � <br />1 0 1 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Santa Ana Vision Zero <br />17th St from Ross St to Broadway <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 5,499,832 <br />$ <br />6,959,050 <br />TOTAL RIGHT OF WAY COST $ 220,000 <br />$ <br />267,664 <br />TOTAL CAPITAL OUTLAY COSTS $ 5,720,000 <br />$ <br />7,227,000 <br />$ 720,000 <br />$ <br />880,000 <br />$ 1,010,000 <br />$ <br />1,230,000 <br />RIGHT OF WAY (2%) <br />made. <br />118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.