My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. MacArthur Boulevard and Raitt Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Macarthur Boulevard and Raitt Street is a busy intersection at the <br />southern edge of the City. The northbound and southbound legs of <br />the intersection have single through lanes and less traffic than east - <br />west legs. Segerstrom High School and Greenville Fundamental <br />School occupy the west corners of the intersection. Single family <br />residential is on both east side corners. Not counting turn lanes, <br />there are six west -east vehicle lanes. Collision rates are low with no <br />fatalities or severe injuries during the study period. Raised medians <br />are provided on the busiest westbound and eastbound legs of the <br />intersection on MacArthur Boulevard and the southbound leg on <br />Raitt Street. Sidewalks, curb ramps, and bus stops are provided on <br />MacArthur Boulevard. No bicycle facilities are provided. Figure 6-18 <br />shows recommended improvements that could be extended farther <br />along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />M 9 a� <br />0 0 0 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />MacArthur Blvd/Raitt St <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 1,480,500 <br />$ <br />1,801,255 <br />TOTAL RIGHT OF WAY COST $ 40,000 <br />$ <br />48,666 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,521,000 <br />$ <br />1,850,000 <br />$ 200,000 <br />$ <br />250,000 <br />LD <br />$ 270,000 <br />$ <br />330,000 <br />RIGHT OF WAY (2%) <br />. Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.