My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. Dyer Road and Flower Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Dyer Road/Segerstrom Avenue and Flower Street is a busy <br />intersection, in the southeast quarter of the City. Land uses include <br />Saddleback High School at the southwest corner, industrial and a <br />railroad line on both east corners. Single family residential occupies <br />the northwest corner of the intersection. Four vehicle lanes, not <br />counting turn lanes, are on all legs of the intersection. Collision <br />rates are moderately high around the intersection, but there were <br />no fatalities or severe injuries during the study period. However, <br />due to roadway characteristics, the safe systems approach calls <br />for improvements. Raised center median exists on the westbound <br />and eastbound lanes on Segerstrom/Dyer. Sidewalks, curb ramps, <br />and bus stops are provided on both sides of the street. No bicycle <br />facilities are provided on the westbound and eastbound legs. <br />However a multi -use path runs north -south on the east side of Flower <br />Street for bicyclists. Figure 6-19 shows recommended improvements <br />that could be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />r <br />0 0 0 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Dyer Rd/Flower St <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 1,260,345 <br />$ <br />1,533,402 <br />TOTAL RIGHT OF WAY COST $ 40,000 <br />$ <br />48,666 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,301,000 <br />$ <br />1,583,000 <br />Z WED <br />(12.5X) <br />Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.