My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Segerstrom Avenue and Bear Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Segerstrom Avenue and Bear Street is a three-way intersection in the <br />southwest quarter of the City with Carl Thornton Park and McFadden <br />Institute of Technology occupying the north side of the intersection <br />and no through road. Both south side corners have single family <br />residential uses. Bear Street extends south from the intersection <br />with three through lanes; not counting turn lanes. Westbound and <br />eastbound lanes total four without counting turn lanes. Raised <br />medians are provided on all three legs of the intersection. Traffic <br />levels are relatively low along with lower collision rates without <br />fatalities or severe injuries during the study period. No bicycle <br />facilities are provided on the vehicle travel lanes. However, there is a <br />multi -use path running north -south along Bear Street and extending <br />north of the intersection into Carl Thornton Park. Figure 6-21 shows <br />recommended improvements that could be extended farther along <br />the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />O f Q� <br />V V <br />0 0 0 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Segerstrom Ave/Bear St <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)"' <br />TOTAL CONSTRUCTION COST $ 1,102,185 <br />$ <br />1,340,977 <br />TOTAL RIGHT OF WAY COST $ 40,000 <br />$ <br />48,666 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,143,000 <br />$ <br />1,390,000 <br />$ 150,000 <br />$ <br />190,000 <br />$ 210,000 <br />$ <br />260,000 <br />RIGHT OF WAY (2%) <br />Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.