My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-020 - Pavement Managment Plan for Measure M2 Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-020 - Pavement Managment Plan for Measure M2 Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:44:53 PM
Creation date
6/13/2024 11:42:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-020
Item #
33
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA Page 5 <br />2024 Citywide Pavement Management Plan - OCTA Submittal <br />Final Report - May 27, 2024 <br />FINDINGS AND RECOMMENDATIONS <br />Through our assessment of historical maintenance performed within the City and through our discussions <br />with City staff the conditional data found across the network clearly shows that the City has applied <br />strong, preventative maintenance strategies over the past decade. Pavement management involves <br />frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering <br />and time, preventative maintenances (such as slurry seal, stop gap, etc.) have limited benefits. <br />Our study has shown that key overlay projects will be needed over the next seven years to maintain the <br />network's high level of condition. Currently, the City's two major streets networks (Arterial & Local) hold <br />very high weighted PCI values; it is our recommendation that a proactive, common sense overlay program <br />and a continued slurry seal program be scheduled over the next several fiscal years. This will ensure that <br />the citywide weighted PCI will sustain itself and allow for routine slurry seal maintenance to continue. <br />We have found and recommend the following detailed items which should be reviewed and considered <br />for a proactive approach to the future management of the PMP: <br />ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS <br />The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently <br />in "fair' condition. To maintain this condition, it is critical that preventive maintenance and overlay <br />activities are funded at the levels identified on page 9 to maintain a "fair" network weighted average PCI <br />value. <br />Our MPAH findings for conditional data and recommendations for revenue expenditures are shown <br />below: <br />• The MPAH network has a weighted PCI of 72.7 <br />• The MPAH network consists of 129.3 miles and 33,615,007 SF of pavement; <br />• Currently, 12% of the MPAH network (15.8 miles) qualify for slurry seal/stop gap maintenance; <br />22% of the MPAH network (28.4 miles) qualify for rehabilitation/reconstruction maintenance; <br />• MPAH maintenance projects should focus on the increasing the current PCI above a weighted <br />average of 80 by FY 2031; <br />• Develop a proactive fiscal and planned approach to identify MPAH overlay projects based on the <br />deterioration modeling within StreetSaver; <br />o Appropriate the MPAH CIP revenues at an average of $12,420,700/yr level for the seven- <br />year term to generate the beneficial results identified on page 9; and <br />o The Santa Ana "Increase PCI" budget (page 9) will increase the MPAH weighted PCI of <br />72.7 to 75.0 after seven years, additionally, the citywide deferred backlog increases from <br />a level of $285.2 million to $440.3 million after seven years; and <br />• Perform pavement inspections on the MPAH network every two years to continue the City's <br />
The URL can be used to link to this page
Your browser does not support the video tag.