My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:44:53 PM
Creation date
6/13/2024 11:42:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-020
Item #
33
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Pavement Network <br />As shown in Table 3-3, the majority of arterial streets' pavements are currently either in "Fair" <br />(27.0 percent), "Good" (23.5 percent), or "Very Good" (26.2 percent) conditions. These results, <br />which show a condition stabilization (no significant increase or decrease) in the top three condition <br />categories of "Fair", "Good", and "Very Good" from 2022 to the current year (77 percent for all <br />three categories), indicate that the City has been performing proper and timely maintenance and <br />rehabilitation strategies for the arterial streets to maintain the percentage of streets in the top <br />three condition categories (refer to Table 3-3 for the comparison). The sustaining in arterial street <br />pavement conditions can be attributed to local funding and various funding sources from Orange <br />County Transportation Authority, County of Orange, State of California, and other various <br />agencies that the City has received in past years. Figure 3-5 shows the current PCI distribution <br />of the arterial network. <br />Figure 3-5: Current PCI Distribution (Arterial Network) <br />Po <br />Fair, 271 <br />Current PCI Distribution (Arterial Network) <br />Very Poor, ?, 3% <br />Very Good. 25.2% <br />. Very Good ■ Good ■ Fair ■ Poor ■ Very Poor <br />235% <br />City of Santa Ana 2024 Pavement Management Program 3-3-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.