My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:44:53 PM
Creation date
6/13/2024 11:42:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-020
Item #
33
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table Of Contents <br />FIGURES <br />Figure E-1: PCI Distribution for 2020, 2022 and 2024............................................................. <br />E-1 <br />Figure 2-1: Sample Pavement Deterioration Curve..................................................................2-3 <br />Figure 3-1: Entire Pavement Network Summary......................................................................3-1 <br />Figure3-2: Arterial Street.........................................................................................................3-2 <br />Figure3-3: Local Street............................................................................................................3-3 <br />Figure 3-4: Current PCI Distribution (Entire Pavement Network)..............................................3-5 <br />Figure 3-5: Current PCI Distribution (Arterial Network).............................................................3-6 <br />Figure 3-6: Current PCI Distribution (Local Network)................................................................3-7 <br />TABLES <br />Table E-1: Funding Alternatives Summary.............................................................................. E-4 <br />Table 3-1: Current Entire Pavement Network Summary...........................................................3-1 <br />Table 3-2: Pavement Condition Index and Treatment Type.....................................................3-4 <br />Table 3-3: PCI Distribution Comparison (2020, 2022 vs. 2024)................................................3-5 <br />Table 3-4: PCI Distribution.......................................................................................................3-8 <br />Table 4-1: Cost by Condition (Arterial Network).......................................................................4-3 <br />Table 4-2: Cost by Condition (Local Network)..........................................................................4-3 <br />Table 4-3: Existing Funding (Entire Pavement Network)..........................................................4-8 <br />Table 4-4: Existing Funding (Arterial Network).........................................................................4-8 <br />Table 4-5: Existing Funding (Local Network)............................................................................4-9 <br />Table 4-6: Alternative Funding Levels Required To Maintain Existing PCI <br />(Entire Pavement Network)...................................................................................4-11 <br />Table 4-7: Alternative Funding Levels Required To Maintain Existing PCI <br />(Arterial Network)..................................................................................................4-11 <br />Table 4-8: Alternative Funding Levels Required To Maintain Existing PCI <br />(Local Network)....................................................................................................4-12 <br />Table 4-9: Alternative Funding Levels Required To Improve PCI <br />(Entire Pavement Network)...................................................................................4-14 <br />Table 4-10: Alternative Funding Levels Required To Improve PCI <br />(Arterial Network)..................................................................................................4-14 <br />Table 4-11: Alternative Funding Levels Required To Improve PCI <br />(Local Network)....................................................................................................4-15 <br />City of Santa Ana 2024 Pavement Management Program ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.