Laserfiche WebLink
RFP #24-038A: On-Call Environmental Review Services for C HAM B E RS <br /> the Housing Division <br /> City of Santa Ana GROUP <br /> based on the City CEQA Assessment—VMT Analysis Guidelines.If necessary, LLG will recommend appropriate mitigation <br /> measures to reduce the impact. They will provide the project team a toolbox of potential mitigation or project <br /> alternatives for consideration in the analysis. Utilize the California Air Pollution Control Officers Association (CAPCOA) <br /> standards or the local guidelines and determine if the selected mitigation measures reduce the project's VMT impacts <br /> to less than significant. <br /> LLG will prepare a draft memorandum, which details all the above-mentioned items, their findings, and conclusions. <br /> The draft memorandum will be submitted for the City's review and review by appropriate members of the project team. <br /> If necessary,they will update the draft memorandum based on Project team comments and submit a final VMT analysis <br /> memorandum to the City. <br /> Traffic Impact Analysis (TIA): LLG will confirm the development description of the proposed project with the project <br /> team and work schedule.They will coordinate with City staff to confirm the scope of work for the TIA(i.e., number of <br /> study intersections). <br /> LLG will visit the project study area and inventory existing roadway conditions. They will research existing historical <br /> traffic count data at the key study intersections located within the vicinity of the proposed project site.LLG will conduct <br /> a.m. peak period and p.m. peak period manual turning movement counts at the key study intersections identified to <br /> be evaluated by City staff.They will coordinate with City staff to obtain cumulative project information. <br /> They will prepare trip generation forecasts for the proposed Project for a typical weekday over a 24-hour period, as <br /> well as for the commuter a.m.and p.m. peak hours.The trip generation forecasts will either be estimated based on the <br /> application of trip rates included in Trip Generation, 10th Edition, published by ITE (2017) or based on the operations <br /> of the facility. <br /> LLG will develop a.m. peak hour and p.m. peak hour"existing plus project", "near-term cumulative plus project" and <br /> "long-term plus project" traffic volume projections for the key study intersections. They will prepare a.m. peak hour <br /> and p.m. peak hour"existing plus project", "near-term cumulative plus project" and "long-term plus project" Level of <br /> Service(LOS)calculations at the key study intersections.Where necessary,the traffic study will identify the appropriate <br /> intersection improvements to offset the proposed Project's traffic impacts. <br /> LLG will then prepare a draft report that details all of the above-mentioned items, their analysis, findings, and <br /> conclusions.The draft report will be submitted for review and review by appropriate members of the project team. If <br /> necessary,the report will be updated based on project team comments,and a final report will be submitted to the City. <br /> Est <br /> '2 �' 1979 www.chaIT1he_rsgroupinc corn <br />