Laserfiche WebLink
Item No. 5- PCC Curb & Gutter(A-2-8) <br /> The work under this item consists of grading, compacting subgrade, constructing 12"wide by <br /> 12"deep AC Hot Mix on compacted subgrade, and constructing PCC Curb&Gutter(outside of <br /> the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section <br /> 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs,Walks,Gutters, Cross <br /> Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard <br /> Specifications,plans, and/or any City's Special Provisions/Contract Documents provided by the <br /> City for each Task Order. <br /> Payment for PCC Curb & Gutter(A-2-8) shall be at the contract unit price bid per Linear Foot <br /> as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br /> furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br /> compensation will be allowed therefore. <br /> Item No. 6-Signing& Striping <br /> The work under this item for Signing and Striping shall be in accordance with the latest CA <br /> MUTCD, Caltrans and any City Standard Specifications,plans, and/or any City's Special <br /> Provisions/Contract Documents to be provided for each Task Order Work. <br /> Payment for Signing& Striping shall be at the contract Lump Sum listed in the Fee Proposal, <br /> and shall include full compensation for doing all work, including furnishing all materials, labor, <br /> equipment,tools,disposal of all removed materials and incidentals as required and no additional <br /> compensation will be allowed therefore. <br /> Item No. 7—Traffic Control <br /> The work under this item for Signing and Striping shall be in accordance with the latest Watch <br /> Manual, CA MUTCD, Caltrans and any City Standard Specifications,plans, and/or any City's <br /> Special Provisions/Contract Documents to be provided for each Task Order Work. <br /> Payment for Traffic Control shall be at the contract unit price per Lump Sum(LS) as listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials,labor, equipment, tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. <br /> City of Santa Ana RFP 23-182 <br /> Page Al-7 <br />