Payment for Remove and Replace 18"Reinforced Concrete Pipe shall be at the contract unit
<br /> price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for
<br /> doing all work, including removal or replacement of existing pipe,furnishing all materials, labor,
<br /> equipment, tools,and incidentals as required to install new pipe, bedding preparation, and no
<br /> additional compensation will be allowed therefore.
<br /> Item No. 5—Remove and Replace 30"Reinforced Concrete Pipe
<br /> The work under this item consists of grading, compacting subgrade, and constructing Remove
<br /> and Replace 30"Reinforced Concrete Pipe and shall be in accordance with the provisions of
<br /> Section 306, "Underground Conduit Construction"and any City Standard Specifications,plans,
<br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task
<br /> Order.
<br /> Payment for Remove and Replace 30"Reinforced Concrete Pipe shall be at the contract unit
<br /> price paid per Linear Foot as listed in the Fee Proposal,and shall include full compensation for
<br /> doing all work, including removal or replacement of existing pipe,furnishing all materials, labor,
<br /> equipment,tools,and incidentals as required to install new pipe, bedding preparation,and no
<br /> additional compensation will be allowed therefore.
<br /> Item No. 6-Catch Basin (Type`B,"W=10')
<br /> The work under this item consists of grading, compacting subgrade, and constructing Catch
<br /> Basin and shall be in accordance with the provisions of Section 301-1,"Subgrade Preparation,"
<br /> and Section 303-1, "Concrete Structures" and any City Standard Specifications,plans, and/or
<br /> any City's Special Provisions/Contract Documents provided by the City for each Task Order.
<br /> Payment for Catch Basin (Type "B," W=10') shall be at the contract unit price paid per Each as
<br /> listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br /> removal or replacement of existing catch basins and/or other appurtenances,including furnishing
<br /> all materials,labor, equipment, tools, and incidentals as required to construct a new catch basin,
<br /> soil preparation and compaction,and no additional compensation will be allowed therefore.
<br /> Item No. 7—Traffic Control
<br /> The work under this item for Signing and Striping shall be in accordance with the latest Watch
<br /> Manual, CA MUTCD, Caltrans and any City Standard Specifications,plans, and/or any City's
<br /> Special Provisions/Contract Documents to be provided for each Task Order Work.
<br /> Payment for Traffic Control shall be at the contract unit price per Lump Sum(LS) as listed in
<br /> the Fee Proposal,and shall include full compensation for doing all work, including furnishing all
<br /> materials, labor, equipment, tools, and incidentals as required and no additional compensation
<br /> will be allowed therefore.
<br /> City of Santa Ana RFP 23-182
<br /> Page Al-13
<br />
|