My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE PRLICH & SONS, INC.
Clerk
>
Contracts / Agreements
>
M
>
MIKE PRLICH & SONS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:32:45 AM
Creation date
6/18/2024 10:32:41 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE PRLICH & SONS, INC.
Contract #
A-2024-069-02
Agency
Public Works
Council Approval Date
5/21/2024
Expiration Date
5/20/2027
Insurance Exp Date
8/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION D: UNDERSTANDING SCOPE OF SERVICES <br /> Mike Prlich and Sons, Inc. anticipates that City will provide a location of repair. Additionally, <br /> MPS assumes that, if necessary, the City will provide surveyed line and grade and geotechnical <br /> services. MPS assumes all work will be performed under WATCH manual traffic control. If <br /> required MPS can provide engineered traffic drawings by Traffic Control Engineering, Inc. or <br /> other similar vendors at the direction of the City. <br /> Mike Prlich and Sons, Inc. has a proven track record of timely responses and rapid repairs to <br /> existing facilities for numerous emergency projects with several local agencies in Southern <br /> California. The response time excluding travel is always less than 1 hour, and typically within <br /> 10-minutes plus travel time. As provided in the Cover Letter, the direct cell phone numbers are <br /> listed for all key personnel directly authorized to respond to any given emergency. These <br /> numbers can be used 24-hours per day, in addition to the Office Phone number during regular <br /> working hours. <br /> Mobilization efforts are initiated promptly by Key Personnel to line-up labor, equipment, <br /> materials, and subcontractors for the given emergency. The project supervision has the <br /> authority to direct the deployment of resources to meet the needs to an emergency. <br /> As with all construction projects, safety and affective communication will take priority over any <br /> work activities. All of our personnel maintain certification in First Aid/CPR and Confined Space <br /> Entry, as well Competent Person Training. Prior to entering any zone, we will perform a visual <br /> site assessment to identify potential risks and hazards associated with site access for both <br /> personnel and equipment. Once the risks and hazards have been identified, mitigation as <br /> needed will be implemented. All of this information will be communicated to the Owner and <br /> Interested Parties, as well as our own work force and subcontractors. Any emergency repair <br /> and/or maintenance activity work will be implemented with consent from the City. <br /> Staffing Plan <br /> The projects will be staffed full time by at least one Working Superintendent or Foreman. <br /> Additional Superintendents and Project Management!Project Engineering will be readily <br /> available depending on the nature of the emergency. The crew make up will be project specific, <br /> but typically craft specific Foreman with supporting Operating Engineers, Laborers, Teamsters, <br /> Pipe Layers, Carpenters, Tec. Will be used as necessary. A Quality Control inspector will be <br /> utilized as necessary. Our in-house Project Engineering staff, along with the Project Managers <br /> will ensure that compliance with the contract documents, as well as additional local, state, and <br /> federal requirements are being met. <br /> In addition to sewer pipeline repairs, MPS has experience with all of the following tasks: <br /> Dams, debris basins, spreading grounds, pump stations, low flow diversions, seawater barriers <br /> projects, channel walls, channel inverts, channel access roads and ramps, channel drop <br /> structures catch basins, inlet/outlet structures, ocean outlet structures, corrugated metal pipes <br /> (CMP), reinforced concrete pipes and boxes, and associated appurtenant structures. <br /> Personnel will be adjusted and allocated to accommodate the City's emergency needs. This will <br /> be Priority One of our Work Plan. In addition, we have depths to run projects on a 24-hour <br /> basis 7 days per week. Likewise, we are signatory with multiple trades. As such, additional <br /> IZZ 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.