Laserfiche WebLink
Sample Task Order C—Stormdrain <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY <br /> 2 AC Pavement 130 TN <br /> 3 Remove&Replace 18"Corrugated Metal Pipe(CMP) 75 LF <br /> 4 Remove&Replace 18"Reinforced Concrete Pipe (RCP) 75 LF <br /> 5 Remove&Replace 30"Reinforced Concrete Pipe(_RCP) 75 LF <br /> 6 Catch Basin(Type "B",W=10') 1 EA <br /> 7 Traffic Control Work 1 LS <br /> Sample Task Order D— Street Lighting <br /> • Description Qty Unit Unit Price Total <br /> Furnish and Install Streetlight Pole 10 EA <br /> Remove Existing Wooden Pole 5 EA <br /> Remove Existing Steel Pole 5 EA <br /> Install Electrical Meter Pedestal 1 EA <br /> Install 2"PVC Conduit 4000 LF <br /> Install No.5 Pull Box 3 EA <br /> Pothole Street Light Pole Location 10 EA <br /> Traffic Control Work , 1 LS <br /> SURETY BOND <br /> For each Task Order Issued by Public Works Agency, the Contractor shall provide cash deposit <br /> or surety"Payment"and "Performance"bonds in the amounts specified by the "Greenbook" and <br /> City of Santa Ana upon approval of the proposed itemized cost estimate for each approved on- <br /> call or emergency Task Order which will be based upon the City's Standard Plans,As-Built Plans, <br /> or other direction from the Public Works Agency. The cash deposit or the surety bonds shall <br /> guarantee the construction of all necessary improvements for the Task Order, however, Bid <br /> Bonds shall not be required at the time of the submittal of RFP Proposal. The City also <br /> reserves the right to retain 10% of progress pay amounts for the one-year warranty work. The <br /> cash deposit shall be released approximately 135 days after all related permits and/or other <br /> approvals required are signed off by the City's Construction Inspector, and the passage of any <br /> lien periods. In the event the work is not completed within one year of the date that a street work <br /> permit or Task Order is signed, applicant agrees that the City may apply the cash deposit to the <br /> cost of completing the work and such work may be completed at the sole convenience of the City <br /> of Santa Ana. The deposit amount will be determined based upon the surface drainage and street <br /> improvement plans. <br /> City of Santa Ana RFP 23-182 <br /> Page Al-3 <br />