My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Clerk
>
Contracts / Agreements
>
E
>
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:36:28 PM
Creation date
6/25/2024 8:32:26 AM
Metadata
Fields
Template:
Contracts
Company Name
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.)
Contract #
A-2023-194-03A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
9/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Project Overview <br />SITE BACKGROUND & PROPOSED DEVELOPMENT <br />The project site is located in the City of Santa Ana near the intersection of West Lake Center Drive and <br />South Susan Street (APNs 414-261-01, 414-242-09, and 414-272-10). The project site consists of a vacant <br />5.59-acre parcel and Lake Center Office Park (5.75 acres), which is comprised of three office buildings <br />(approximately 178,000 square feet), an artificial lake, site landscaping, and surface parking. The <br />applicant is proposing to amend SD-58, which was originally approved to allow for the development of <br />Lake Center Office Park, to revise the permissible uses to allow for industrial land uses. The project would <br />demolish the existing office park and would construct three industrial buildings totaling approximately <br />324,044 square feet. As proposed, the project would also require review and approval by the Planning <br />Commission and City Council for a Zoning Ordinance Amendment (ZOA). <br />CEQA APPROACH <br />Based on our review of the materials provided by the City and our understanding of CEQA and the <br />environmental issues associated with the proposed project, it appears that the project is consistent with the <br />requirements set forth under CEQA Guidelines Section 15183 for preparation of a CEQA 15183 Exemption <br />as it is consistent with the City's General Plan Update for which an EIR was certified in 2022. <br />B. Qualifications and Experience <br />Years of Experience <br />EPD has a long history of over 10 years of providing environmental documentation on behalf of both public <br />agencies and private developers in California. EPD staff collectively have many decades of experience <br />managing and preparing all types of CEQA/NEPA documentation, including categorical and 15183 <br />exemptions, initial studies, negative declarations, mitigated negative declarations (MNDs), environmental <br />impact reports (EIRs), and mitigation monitoring and reporting programs (MMRPs), as well as National <br />Environmental Policy Act (NEPA) environmental assessments, Findings of No Significant Impact (FONSIs), and <br />Environmental Impact Statements (EISs). <br />Project Team <br />EPD Team <br />The following key staff members lead the EPD Project Management Team. The City's primary day-to-day <br />contact and CEQA Project Principal would be Konnie Dobreva, supported by Meaghan Truman as the Project <br />Manager. Qualifications and resume summaries for these and other staff are provided below. Resumes for <br />all staff assigned to the project are included in Appendix A to this proposal. <br />• Konnie Dobreva, JD, Vice President of Environmental Planning — Project Principal, Quality <br />Assurance/Quality Control <br />• Jeremy Krout, AICP, President — Client Services <br />• Meghan Macias, TE, Transportation Planning Director — Traffic Impact Analysis Peer Review <br />• Alex Garber, Senior Technical Planner — Air Quality, GHG and Energy Analysis Peer Review <br />• Meaghan Truman, Associate Environmental Planner III — Project Management, Technical Study <br />Peer Review, and CEQA Document Peer Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.