My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (18)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 9:20:20 AM
Creation date
7/1/2024 12:13:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2024-078
Agency
Public Works
Council Approval Date
6/4/2024
Expiration Date
12/31/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-3-3023 <br /> HARBOR BOULEVARD CONNECTED CORRIDOR PROJECTS <br /> 1 E. The AUTHORITY, or agents of the AUTHORITY, shall manage, procure, implement, and <br /> 2 complete all aspects of the PROJECT as identified in the APPLICATIONS, including filing all <br /> 3 documentation necessary to comply with the requirements of the SMART, REAP, and TIRCP guidelines <br /> 4 and funding reporting. <br /> 5 F. The AUTHORITY, or its agents, shall collect all data necessary to deliver the PROJECT, <br /> 6 as specified in the APPLICATIONS. <br /> 7 G. The AUTHORITY, or its agents, shall coordinate outreach activities with <br /> 8 PARTICIPATING AGENCIES for the PROJECT. <br /> 9 H. The AUTHORITY, or its agents, shall study, evaluate, and recommend TSP and ITS <br /> 10 ELEMENTS best suited for the desired operation by each Party. <br /> 11 I. The AUTHORITY, or its agents, shall provide construction management oversight during <br /> 12 the construction of the PROJECT. <br /> 13 J. The AUTHORITY, or its agents, shall prepare the PROJECT reports, plans,and materials <br /> 14 that will be shared with PARTICIPATING AGENCIES and other PROJECT stakeholders. <br /> 15 ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br /> 16 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br /> 17 and funding of the PROJECT: <br /> 18 A. The PARTICIPATING AGENCIES shall provide a technical representative to <br /> 19 participate as a member of the PROJECT's Project Development Team (PDT). <br /> 20 B. The PARTICIPATING AGENCIES shall authorize the AUTHORITY to manage, <br /> 21 procure, and implement all aspects of the PROJECT. <br /> 22 C. The PARTICIPATING AGENCIES shall participate and support the PROJECT <br /> 23 implementation within the timeframe outlined in the APPLICATION and consistent with the SMART, <br /> 24 REAP, and TIRCP guidelines adopted by the AUTHORITY. <br /> 25 / <br /> 26 D. The PARTICIPATING AGENCIES shall provide AUTHORITY, or its agents all current <br /> Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.