My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
YUNEX TRAFFIC (YUNEX, LLC)
Clerk
>
Contracts / Agreements
>
Y
>
YUNEX TRAFFIC (YUNEX, LLC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 12:28:19 PM
Creation date
7/1/2024 12:21:45 PM
Metadata
Fields
Template:
Contracts
Company Name
YUNEX TRAFFIC (YUNEX, LLC)
Contract #
A-2024-082
Agency
Public Works
Council Approval Date
6/4/2024
Expiration Date
7/1/2027
Insurance Exp Date
6/30/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Contractor shall remove all unauthorized attachments. <br /> 6. Contractor shall notify City of any graffiti. It is not the Contractor's <br /> responsibility to remove graffiti. <br /> (i) Maintenance Record: <br /> The Contractor shall maintain a record log in each location showing the date and <br /> time of any service. It shall consist of: <br /> a. Routine Maintenance <br /> b. Extraordinary Maintenance <br /> All records shall be legibly written or printed. These record logs shall become <br /> property of the City. <br /> (b) Closed Circuit Television(CCTV) Camera: <br /> (i) Maintenance period: <br /> The Contractor shall perform a complete inspection and service of each CCTV <br /> once every three(3)months for proper operation and cleanliness. <br /> (ii) Maintenance Tasks: <br /> • Cabinets (if applicable): <br /> Some CCTV locations have dedicated type 332 cabinets. For these locations, <br /> the Contractor shall clean the cabinets thoroughly on the inside, including all <br /> components.The Contractor shall remove all unauthorized external <br /> attachment such as notices,posters,signs, etc. and notify the City of any <br /> graffiti that is on the signal equipment. It is not the Contractor's <br /> responsibility to remove the graffiti <br /> o Ventilation system: <br /> The contractor shall ensure that the cabinet's ventilation system is in <br /> working order. Ensure that the Thermostat and Fan operates <br /> properly. The air filter shall be replaced and dated every 90 days <br /> (regardless of condition). <br /> o Battery Backup System(if applicable): <br /> The Contractor shall ensure that the battery backup system is charged <br /> and in working order. <br /> • Field Equipment <br /> 1. The Contractor shall check all poles and standards for damages. <br /> 2. The contractor shall clean the camera's housing lens or dome as <br /> appropriate. <br /> a. To minimize scratches or damage to the Video Detection,use a clean <br /> microfiber towel, and a polish specifically designed for use on <br /> Plexiglas, or other cleaner as recommended by the manufacturer. Do <br /> not use any ammonia based or glass cleaners. <br /> City of Santa Ana RFP 24-046 <br /> Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.