V 0 ,e <br />PAST CITY OF SANTA ANA EXPERIENCE <br />n <br />� I <br />� I <br />� I <br />I <br />GRAND AVENUE WIDENING PROJECT <br />Reference: Mr. David Biondolillo <br />Telephone: 714/647 -5603 <br />Estimated <br />Construction Cost: $11 Million <br />Completion Date: 1998 <br />Project Manager: Jeffrey Fromhertz, P.E. <br />EDINGER AVENUE /GRAND AVENUE <br />INTERSECTION ENHANCEMENT PROJECT <br />Reference: <br />Telephone: <br />Estimated <br />Construction Cost: <br />Completion Date: <br />Project Manager: <br />Mr.Sharir Gobran, P.E. <br />714/647 -5615 <br />$9 Million <br />1999 <br />Jeffrey Fromhertz, P.E. <br />RAITT STREET, SEVENTH STREET AND <br />FOURTH STREET IMPROVEMENT PROJECT <br />Reference: Mr. David Niknafs <br />Telephone: 714/647 -5632 <br />Estimated <br />Construction Cost: $5 Million <br />Completion Date: 1996 <br />Project Manager: Earl T. (Mac) McArthur, P.E. <br />Project Engineer: Jeffrey Fromhertz, P.E. <br />Prop yy,p[S -jexpt.aoc <br />I -2 <br />The project involved preparation of alternative alignment plans <br />for the environmental document for Grand Avenue, from First <br />Street to Seventeenth Street in the City of Santa Ana. The City <br />is planning on upgrading this street to major arterial standards' <br />Along with geometric plans, right -of -way, striping and utility <br />plans have been prepared for the preferred alternative and <br />several other alternatives. <br />Prepared Project Report and Preliminary Engineering for <br />intersection improvement project. Three separate alternatives <br />were developed and studied for economic feasibility. <br />Environmental document was supplemented for Moulton <br />Parkway superstreet. Alternative street plans, utility plans, <br />right -of -way impact plans were prepared as part of project <br />report. <br />These projects involved the design and preparation of PS &E of <br />pavement rehabilitation and reconstruction on these three <br />ISTEA funded major arterial streets. Specific project tasks <br />included: <br />• Review of Pavement Analysis Report and coordination <br />with geotechnical firm during report preparation. <br />• Utility identification and coordination of adjustments. <br />• Prepared PS &E for the following project elements: asphalt <br />concrete overlays with fabric liner and new PCC <br />pavement, pavement grinding to match existing conditions. <br />digout of deteriorated areas, installation of new reinforced <br />concrete bus stop pads, and removal and replacement of <br />curb and gutter. <br />• Coordinated preparation of construction traffic control <br />plans <br />ASL CONSULTING ENGINEERS <br />