My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASL CONSULTING ENGINEERS 3-2000
Clerk
>
Contracts / Agreements
>
A
>
ASL CONSULTING ENGINEERS 3-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:25:51 PM
Creation date
3/19/2003 10:00:26 AM
Metadata
Fields
Template:
Contracts
Company Name
ASL CONSULTING ENGINEERS (TETRA TECH)
Contract #
A-2000-164
Agency
Public Works
Council Approval Date
10/2/2000
Expiration Date
7/1/2002
Insurance Exp Date
10/1/2001
Destruction Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUMES <br /> <br />Thomas L. Epperson, P.E. <br />Project Manager <br /> <br />Education: <br /> <br />University of California Irvine <br />B.S. Environmental <br />Engineering, 1978 <br /> <br />Registration: <br /> <br />Registered Civil Engineer <br />California No. 36399 <br /> <br />Professional Affiliations: <br /> <br />American Water Works <br />Association <br /> <br />Orange County Water <br />Association <br /> <br />WateReuse Association <br /> <br />American Society of Civil <br />Engineers <br /> <br />Water Environment Federation <br /> <br />Presentations: <br /> <br />WateReuse's 1993 Symposium <br />VII: "Retrofitting from a <br />Landscape User Viewpoint." <br /> <br />WateReuse's 1994 <br />Reclamation Retrofit Seminar: <br />"Retrofitting for Reclaimed <br />Water Use Hardware, <br />Plumbing Changes and <br />Common Problems." <br /> <br />Mr. Epperson has over 20 years of professional experience in water, <br />wastewater, and reclaimed water engineering. Mr. Epperson has been <br />responsible for the preparation of water, wastewater, and reclaimed <br />water master plans; project design reports for various water, wastewater, <br />and reclaimed water facilities; and the planning and design of water, <br />wastewater, and reclaimed water pipelines, along with pump stations <br />and reservoirs. He has been responsible for completing the design, <br />bidding, and construction management of over 150 miles of <br />water/reclaimed water/sewer mains, 22 water/reclaimed water pump <br />stations, 8 well-head facilities, 8 sewer lift stations and 14 <br />water/reclaimed water storage reservoirs throughout Southern <br />California. <br /> <br />Summary of Related Experience: <br /> <br />· Talega Domestic and Non-Domestic Reservoirs, Santa <br /> Margarita Water District - Project Manager for this project <br /> which consists of a 6 MG domestic water reservoir, a 4 MG <br /> nondomestic water reservoir and associated pipeline, valving, <br /> electrical and instrumentation to serve the southerly portion of the <br /> Talega Valley. The domestic reservoir will be a partially buried <br /> pre-stressed concrete reservoir on a, hillside graded by the <br /> Developer. The.nondomestic reservoir will be an aboveground <br /> steel reservoir located on the same site. <br />· Ladera Ranch Reservoir, Santa Margarita Water District - <br /> Project Manager for engineering design and construction support <br /> services for the construction of a 4 MG partially buried prestressed <br /> concrete reservoir. Included in the design is a 24-inch diameter <br /> domestic and nondomestic inlet-out with transmission main, <br /> overflow/storm, drain pipeline facilities, a paved access road, <br /> electrical service and site improvements. <br />· Alamitos Hill Tank Conversions, Long Beach Water <br /> Department -- Project Manager for the design of the conversion of <br /> two reservoirs to reclaimed water including the addition of a <br /> potable water make-up pump. <br />· Big Canyon Reservoir Floating Cover, City of Newport Beach - <br /> - Project Engineer for the design of the floating cover for the 200 <br /> MG Big Canyon Reservoir. <br />· Toll Plaza Reservoir, Silverado Contractors -- Project Manager <br /> for the design of the 200,000 gallon surface reservoir and floating <br /> cover providing domestic water and fire protection for the Eastern <br /> Transportation Corridor Toll Plaza. <br />· Conversion of Crown Valley Reservoir No. 2 to Reclaimed <br /> Water, Moulton Niguel Water District -- Project Manager for the <br /> design of the conversion of the reservoir to reclaimed water <br /> including the addition of a potable water make-up pump. <br />· Aliso Summit Reservoir, Moulton Niguel Water District -- <br /> Project Engineer for the design of the 400,000 gallon partially <br /> buried prestressed concrete reservoir. <br /> <br />ASL Consultin~ Engineers <br /> <br />City of Santa Ana <br />ELEVATED WATER TANK IMPROVEMENTS 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.