My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-028
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1954 (NS-019 - NS-075)
>
NS-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:06:41 PM
Creation date
6/26/2003 10:08:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-028
Date
3/1/1954
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. DRIVEWAYS (Plain Dirt Street) <br /> Cutting curb and constructing curb returns only $ 1.00 <br /> F. DRIVEWAYS (Paved) <br /> Less than 16 ft. in width 2.50 <br /> From 16 ft. to 25 ft. (Measurement on curb cut) 5.00 <br /> Over 25 ft. in width (O.K.~d by Council) 10.00 <br /> <br /> 50 ft. or over " " # 20.00 <br /> <br />G. PAVEMENT <br /> <br /> A permit charge of $5.00 plus 0.2 cents per <br /> 2 square foot of street improvement. <br />N. EXCAVATION PERMIT IN STREET <br /> <br /> $2.50 first 50 feet. C~2 cents per ft. thereafter. <br />I. MAIN SEWER <br /> $2.50 first 50 feet. 0~l cents per foot thereafter. <br />J. SE~ER LATERA~ <br /> $1.00 <br /> (No charge for permits covered by Franchise) <br /> #Section 7206. Charge for Work by City Employees. <br /> "A charge shall be made for work performed by City <br /> <br />Employees, including but not limited to engineering and draft- <br /> of <br />ing, setting and checking/line and grade stakes and engineering <br /> <br />inspection, at cost plus 20 percent and shall be in addition <br />to any permit fees. <br /> <br /> "Section 7207. Plans. <br /> <br /> "Plans for street improvements other than in subdivisions <br />of five or more lots shall be d~awn in the office of the City <br />Engineer, unless other arrangements are made satisfactory to <br />the City Engineer. All street improvement work must be done <br />in strict conformance to the plans approved by the Oity <br />Engineer. <br /> <br />-3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.