Laserfiche WebLink
E. DRIVEWAYS (Plain Dirt Street) <br /> Cutting curb and constructing curb returns only $ 1.00 <br /> F. DRIVEWAYS (Paved) <br /> Less than 16 ft. in width 2.50 <br /> From 16 ft. to 25 ft. (Measurement on curb cut) 5.00 <br /> Over 25 ft. in width (O.K.~d by Council) 10.00 <br /> <br /> 50 ft. or over " " # 20.00 <br /> <br />G. PAVEMENT <br /> <br /> A permit charge of $5.00 plus 0.2 cents per <br /> 2 square foot of street improvement. <br />N. EXCAVATION PERMIT IN STREET <br /> <br /> $2.50 first 50 feet. C~2 cents per ft. thereafter. <br />I. MAIN SEWER <br /> $2.50 first 50 feet. 0~l cents per foot thereafter. <br />J. SE~ER LATERA~ <br /> $1.00 <br /> (No charge for permits covered by Franchise) <br /> #Section 7206. Charge for Work by City Employees. <br /> "A charge shall be made for work performed by City <br /> <br />Employees, including but not limited to engineering and draft- <br /> of <br />ing, setting and checking/line and grade stakes and engineering <br /> <br />inspection, at cost plus 20 percent and shall be in addition <br />to any permit fees. <br /> <br /> "Section 7207. Plans. <br /> <br /> "Plans for street improvements other than in subdivisions <br />of five or more lots shall be d~awn in the office of the City <br />Engineer, unless other arrangements are made satisfactory to <br />the City Engineer. All street improvement work must be done <br />in strict conformance to the plans approved by the Oity <br />Engineer. <br /> <br />-3- <br /> <br /> <br />