My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-036
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1954 (NS-019 - NS-075)
>
NS-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:06:42 PM
Creation date
6/26/2003 10:08:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-036
Date
5/3/1954
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"SECTION 9370.3. Location of Special Fills. <br /> <br /> "A drawing and report shall be submitted showing all fills of <br /> twelve inches (12") or more. <br /> <br /> "~E~TION ?370.4. Filing of Improvement Plans. <br /> <br /> "The subdivider shall filo, either at the time of filing the <br />final map or a~ a later date as hereinafter provided, detailed <br />plans, profiles and specifications of the improvements to be in- <br />stalled as required by the provisions of this Chapter and of all <br />other improvements proposed to be installed by the subdivider in, <br />on, over, or under any street or right-of-way, easement or parcel <br />of land dedicated by the map including the estimatedcost thereof. <br /> <br /> ~$ECTION °371. Fee for Map Checking. <br /> <br /> "On receipt of the final map, the City Engineer shall notify <br />the subdivider snd the subdivider shall pay a fee for checking <br />the same. Such fee shall be twenty-five dollars ($25.00) per <br />map plus one dollar ($1.00) for each lot or parcel in the pro- <br />posed subdivision. <br /> <br />"SECTION 9372. Consideration by Planning Director. <br />"On receipt of the final map, the City Engineer shall <br />immediately submit one (1) copy of the final map to the Planning <br />Director. The Planning Director shall exemine said map and if it <br />complies with the approved tentative map and any requirements <br />imposed as a condition to the acceptance of said map, he shall <br />so notify the City Engineer by a written statement. <br /> <br /> "~$aTION 9372.1. Certiflcstion by City Engineer. <br /> <br /> "The City Engineer shall check the final map as to correct- <br />ness of surveying data, plans, profiles and specifications <br /> <br />-28- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.