My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-1212
Clerk
>
Ordinances
>
1953 - 1999 (NS-001-NS-2415)
>
1974 (NS-1194 - NS-1241)
>
NS-1212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:04:55 PM
Creation date
6/26/2003 10:08:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-1212
Date
7/1/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 8-313. Plumbing and Plan Check Fee. <br /> <br /> Whenever plumbing plans are required by the building <br />official, plan check fees shall be in accordance with the <br />following: <br /> <br /> 1. Large Installations. For plan checking systems <br /> where work involves fixtures that discharge more <br /> than 180 waste fixture units: <br /> <br /> A. Complete project: <br /> <br /> (All systems except fire sprinkler, irriga- <br /> tion sprinkler and swimming pool piping) <br /> <br /> (1) Apartments building, three stories and <br /> lower. <br /> <br /> (a) 15% of the plumbing permit fee. <br /> (2) All other buildings. <br /> (a) 50% of the plumbing permit fee. <br /> B. Individual systems: <br /> <br /> (1) Potable water and standpipe systems <br /> only: <br /> <br /> (a) 60% of the applicable plan check <br /> fee in item A above, $10.00 mini- <br /> <br /> (2) Conventional waste and vent systems only: <br /> <br /> (a) 40% of the applicable plan check <br /> fee in item A above, $7.50 mini- <br /> mum. <br /> <br /> (3) All other systems: <br /> <br /> (a) Fee shall be as shown in subsection <br /> 2 below. <br /> <br /> 2. Other installations. For plan checking individual <br /> systems not included in plans listed under subsec- <br /> tion 1 above: <br /> <br /> A. Building Sewers, each system $10.00 <br /> <br /> B. Combination waste and vent piping sys- <br /> tems, each system 7.50 <br /> <br /> C. Drainage pumps and ejectors, each <br /> system 10.00 <br /> <br /> D. Dry standpipes, each building 10.00 <br /> E. Fuel gas piping systems 7.50 <br /> F. Potable water piping systems: <br /> <br /> (1) Where building supply is one and <br /> one-half (1 1/2) inches or less, <br /> each building 10.00 <br /> <br />-7- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.