Laserfiche WebLink
SECTION <br /> <br />Submit a sanitary sewer study to the <br />Department of Public Works. , <br /> <br />Note: <br /> <br />Existing six (6) inch sewer mains <br />in Grand Avenue are overloaded <br />and cannot be used to accept any <br />large additional flow. <br />Provisions must be made to sewer <br />north to the existing Orange <br />County Sanitation District Trunk <br />that flows west from Fruit Street <br />and Grand Avenue. Contact <br />Subdivisions at 834-4945 for <br />information on the above. <br /> <br />Submit an improvement plan as required by <br />the Department of Public Works for the <br />sewer requirements. <br /> <br />The Developer shall investigate and provide <br />for the following regular fees and <br />assessments. <br /> <br />(1) Drainage assessment fee. <br /> <br />(2) Water Service. <br /> <br />(3) Sewer Connection fee. <br /> <br />(4) Fire protection facilities costs. <br /> <br />10. TRANSPORTATION REQUIREMENTS <br /> <br />SJ <br /> <br />Dedicate street right-of-way on Grand <br />Avenue for a width of fifty (50) feet <br />centerline to property line on all <br />properties included in the development that <br />are not currently dedicated. These <br />properties lie south of Sixth Street. <br /> <br />Submit improvement plans for all required <br />street improvements to the Department of <br />Public Works. <br /> <br />Submit channelization plans for Grand <br />Avenue and Sixth Street to the Department <br />of Transportation Services. <br /> <br />Construct the <br />improvements: <br /> <br />following street <br /> <br />-8- <br /> <br /> <br />