Laserfiche WebLink
-7- <br /> <br />9. <br /> <br />10. <br /> <br />5) Plant trees on-site in lieu of street trees. <br /> <br />6) <br /> <br />Construct complete median with landscaping and irrigation <br />from MacArthur Blvd. southerly as is possible to a <br />point just north of the south boundary of the Greenville <br />School. The landscaping and irrigation will be as <br />approved by the Recreation and Parks Department. <br /> <br />c) Sunflower Ave. <br /> <br />1) Construct curb and gutter at 32 feet from construction <br /> centerline of street. <br /> <br />2) Construct full 8 foot wide sidewalk from existing <br /> walk on the east to Raitt Street. <br /> <br />3) Construct paving as is necessary. <br /> <br />4) Construct ornamental street lighting with underground <br /> power distribution. <br /> <br />5) Plant trees on-site in lieu of street trees. <br /> <br />The sidewalks on MacArthur Blvd. and Sunflower Avenue may also <br />be serpentine and undulating per an approved plan with appropriate <br />easements. <br /> <br />Pay the Department of Transportation Services fees as follows: <br /> <br />a) One percent of construction and improvement per Section 8- <br /> 44 of the Municipal Code. <br /> <br />b) <br /> <br />One quarter the cost of future traffic signals at the <br />intersections of Raitt Street, MacArthur Blvd. and Sunflower <br />Avenue. Estimated at $40,000. <br /> <br />c) <br /> <br />Future landscaping and irrigation of the MacArthur Blvd. <br />median. Approximately $50 per lineal foot of frontage. <br /> <br />Construct 35 foot radius curb returns at the corners of Raitt <br />Street, MacArthur Blvd. and Sunflower Ave. with sidewalk landings <br />and wheelchair ramps per City standard. <br /> <br />The curb returns at the private access way on Raitt Street <br />will have a minimum of 25 feet radii. The returns and adjacent <br />sidewalk will have wheelchair ramps. <br /> <br />The Developer will submit channelization plans for the streets <br />as required and paint the channelizations. <br /> <br />The Developer will also provide and install safety control and <br />street name signs. <br /> <br />"No Stopping Anytime" will be posted on all public streets. <br /> <br /> <br />